Similar Projects
I-85 1.0 MGD Water Reclamation Facility
New Construction
Bidding
$300,000 est. value
Jefferson, GA 30549

Lakeside Water Treatment Plant Chemical Tank Replacement Project
Renovation
Bidding
$700,000 est. value
Flowery Branch, GA 30542

Hightower Water Treatment Plant Expansion
Renovation
Post-Bid
Dawsonville, GA

Shoal Creek Wastewater Treatment Plant Central
Post-Bid
Griffin, GA

Aragon 170,000 Gpd Wastewater Treatment Belt Press And Building
Results
Less than $748,665 est. value
Cedartown, GA

Water Treatment Plant #1 Aerator Replacement
Results
Kingsland, GA 31548

New Well, Chemical Feed Building and Water System Improvements
New Construction, Infrastructure
Bidding
$720,000 est. value
Attapulgus, GA

Water Treatment Plant Expansion Membrane Procurement
New Construction
Post-Bid
GA

Management, Operations, and Maintenance of the Water and Wastewater Treatment Facilities
Results
Saint Marys, GA

W.J. Hooper and T.R. Hicks Water Production Plants - UV System Upgrades
Renovation
Bidding
$300,000 est. value
Jonesboro, Stockbridge, GA 30281

Riverside Drive WTP FY2022 Basin Coatings Project
Renovation
Post-Bid
Gainesville, GA 30501

Water Treatment Plant - 2020 Clearwell and High Service Pump Station
Results
$3,146,000 est. value
Elberton, GA

Water Treatment Building
New Construction - 352 SF
Bidding
Bainbridge, GA 39817

AWTP Chlorine Scrubber System
Renovation
Post-Bid
Macon, GA 31211

Lanier Filter Plant and Shoal Creek Filter Plant High Service In-Line Ultrasonic Flow Meter Installations
Results
Buford, GA 30518

Last Updated 06/22/2022 09:13 AM
Project Title

Water Treatment Plant Clarifier Rehabilitation

Physical Address View project details and contacts
City, State (County) Cedartown, GA   (Polk County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehab the Water Treatment Plant Westech Microfloc two (2) 2.0 MGD of treatment unit clarifiers. Only one treatment unit shall be removed from service at any one time. Rehab shall consist of removing and replacing clarifier screens, media, air lateral, and related clarifier components and appurtenances

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents