Similar Projects
North Western Avenue / Mixed-Use
New Construction, Infrastructure
Design
$3,000,000 est. value
Chicago, IL 60618

Smart Overlay and ADA Improvements
Infrastructure
Bidding
$600,000 est. value
La Grange, IL 60525

Standard Overlay, ADA Ramp Improvements
Infrastructure
Bidding
$600,000 est. value
Glenview, IL 60025

Removal and Replacement Existing Damage Sidewalk, Curb and Gutter
Post-Bid
Bartlett, IL

County Line Road: I-294 Ramp to North Avenue
Post-Bid
IL

Resurfacing, Curb and Gutter Replacement, Sidewalk Replacement, Pavement Widening to Accommodate Bike Lanes
Results
Lemont, IL

Traffic Signal Replacement and Sidewalk Construction on US 20 from Walnut Avenue to Center Avenue in Streamwood
Results
Streamwood, IL 60107

Unpaved Trail Repairs and Improvements
Infrastructure
Bidding
$70,000 est. value
Chicago, IL

Oak Forest HS and Tinley Park HS Parking Lot Improvements
Post-Bid
Oak Forest, Tinley Park, IL 60452

(3.40-Mile) Standard Overlay, ADA Improvements and Channelization
Results
Alsip, Blue Island, Evergreen Park, Merrionette Park, IL

Designed Overlay, Shoulders, Milled Rumble Strips and ADA Improvements
Infrastructure
Bidding
$4,000,000 est. value
Burnham, IL 60633

Far South Parking Lot Improvements
Renovation
Post-Bid
IL

(1,444-Ft.) Smart Overlay and ADA Ramp Improvement
Results
Chicago, IL

Construction of an HMA Shared-Use Path
Infrastructure
Bidding
$600,000 est. value
Morton Grove, IL 60053

2021 Sidewalk Improvements
Post-Bid
Riverside, IL

Last Updated 06/13/2022 03:31 AM
Project Title

Gage Park High School Parking Lot Asphalt Repair

Physical Address View project details and contacts
City, State (County) Chicago, IL 60629   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of HMA of South parking lot 2" inch grind and 2" inch pave of up to 7500 sqft

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents