Similar Projects
Pierpont - Maben Rd
Infrastructure
Design
$1,000,000 est. value
Slab Fork, WV 25920

Mullens - Pierpont Rd
Infrastructure
Design
$1,050,000 CJ est. value
Slab Fork, WV 25920

Resurfacing - Bolt Rd
Infrastructure
Bidding
$650,000 CJ est. value
Fairdale, WV 25839

Resurfacing - Bolt Rd
Infrastructure
Bidding
$650,000 CJ est. value
Fairdale, WV 25839

Paving of Scott Avenue Basketball Court
Infrastructure
Post-Bid
$300,000 est. value
Beckley, WV 25801

EHRM Infrastructure Upgrades Design Beckley, WV VAMC
Infrastructure, Renovation
Post-Bid
$20,000,000 CJ est. value
Beckley, WV 25801

2022 RPM
Infrastructure
Results

Milling and Paving
Infrastructure
Results
$168,500 CJ est. value
Beckley, WV 25801

New Beckley Travel Plaza - West Virginia Parkways Authority
Demolition, New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Beckley, WV 25801

Klockner Pentaplast Expansion / Beaver
New Construction, Infrastructure - 60,000 SF
Pending Verification
$18,000,000 CJ est. value
Beaver, WV 25813

Corridor L BR No 2 EB and WB
Infrastructure
Design
$1,500,000 CJ est. value
Beckley, WV 25801

Wilcox Mem Br +2
Infrastructure
Bidding
$650,000 CJ est. value
Slab Fork, WV 25920

Beckley Veterans Nursing Facility
New Construction, Infrastructure - 120,000 SF
Post-Bid
$70,000,000 CJ est. value
Beckley, WV 25801

Raliegh County Memorial Airport Raleigh County Airport Business Park
Infrastructure
Results
$7,729,959 CJ est. value
Beaver, WV 25813

Neville Street Boutique Hotel
Renovation
Pending Verification
$10,000,000 CJ est. value
Beckley, WV 25801

Last Updated 10/06/2023 09:41 AM
Project Title

Kroger Fuel Center #770 / Beaver

Physical Address View project details and contacts
City, State (County) Beaver, WV 25813   (Raleigh County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation
Project Status All Bids Received, Selection Underway, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 6, 2023, this project is complete and occupied. Information regarding the general contractor was not available.

Details

1 Story Above Grade, 885 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents