Similar Projects
Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Engineering, Planning and Development
Post-Bid

Engineering, Planning and Development
Post-Bid

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Planning Services
Post-Bid
Lake Orion, MI

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

As-Needed Roadway Inspection, Testing, Staking,and Engineering Assistance for the I-96 Flex Route Project
Post-Bid
$225,000,000 est. value
MI

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

As-Needed Construction Testing Services for the I-96 Flex Route Project
Post-Bid
$225,000,000 est. value
MI

Environmental Sampling, Assessment, and Analytical Services
Results

As-Needed ITS Equipment Inspection Services for the I-96 Flex Route Project
Post-Bid
$225,000,000 est. value
MI

Last Updated 09/16/2022 04:31 PM
Project Title

RFP Design - Pontiac Lake RA - ARPA Dumpstation Expansion

Physical Address View project details and contacts
City, State (County) White Lake, MI 48386   (Oakland County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Construction start expected October 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The DNR seeks the services of a qualified engineer to develop plans for the expansion of the dumpstation at Pontiac Lake Recreation Area. Due to the increase in park visitors and use, an expansion to the existing dumpstation is needed to accommodate its users. There is currently one station for 176 campsites; the DNR would like to add (3)-double sided stations to use 6 at one time. The DNR would like to phase to keep at least one operational during construction. This project will use Federal ARPA funding. This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply. ACCEPTING RFP QUESTIONS UNTIL: September 22, 2022 at 2:00 pm ALL questions should be emailed to Sheryl Ananich at ananichs@michigan.gov Depending on the project location, individuals may be required to wear masks to attend meetings and for a firm to be eligible to submit bids / quotations / proposals. Bring and be prepared to wear a mask if required upon arrival. Requirements may change at any time and any updated guidance must be followed. The method of Contractor Selection has not been Determined at this time

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents