Similar Projects
Last Updated | 04/03/2023 11:13 AM |
Project Title | Furnish and Install Air Handler Replacement Kitchen 1 |
Physical Address | View project details and contacts |
City, State (County) | New Orleans, LA 70130 (Orleans County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Ernest N. Morial New Orleans Exhibition Hall Authority (the Authority) is requesting sealed bids for Furnish & Install Air Handler Replacement Kitchen 1 (C-1911). Any questions related to the project and/or to obtain documents, contact the Contracts Department via email at contracts@mccno.com or phone at (504) 582-3562. Proposer must include proposal in a sealed opaque package with the name of the project, and name and address of the Respondent listed clearly on the outside of the package. SEB/DBE Direct or Indirect Participation Goal of _20% Completion- or before 11:59 p.m., December 31, 2023. The TAB Scope of Work is limited to the testing, measurement, and balancing of the individual AHU. Downstream measurements and/or balancing is not required. It is expected that the total performance profile of the unit shall be tested and documented prior to final acceptance. This includes (but is not limited to) water flow and air flow measurements, temperature profiles across coils, electrical performance of fan motors, static pressure measurements, and ambient and interior space conditions during testing. General Valve Installation Requirements 1. Inspect valve and turn through entire service range prior to installation to ensure proper functioning. 2. Examine threads on threaded valve ends to verify no damage has taken place and threads are clean. 3. Align mating flanges and verify bolt holes and gasket assembly matches. 4. Do not attempt to repair or rebuild damaged valves - replace with new. 5. Install valves with unions or flanges at pieces of equipment arranged to allow service, maintenance, and equipment removal without system shutdown. 6. Locate valves for easy access and inspection. 7. Install valves in horizontal piping with stems at or above center of pipe 8. Install isolation valves at each branch or riser connections to mains or as indicated. 9. On solder-joint valves with plastic components, take caution not to exceed temperature rating of plastic components during soldering activity. 10. Install hose-end drain valves at the base of each riser, at low points in the system, and where required to drain water piping. 11. Valve and Piping for Fire Protection Systems are outlined in Section 15300. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |