Similar Projects
Oasis Road Solar Garden
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Sunrise Township, MN 55056

Sunrise Fiberglass Cold Storage Building
New Construction, Infrastructure - 5,000 SF
Conception
$500,000 CJ est. value
Wyoming, MN 55092

Katie's Glen
New Construction, Infrastructure
Design
$21,500,000 CJ est. value
Wyoming, MN 55092

Katie's Glen
New Construction, Infrastructure
Design
$21,500,000 CJ est. value
Wyoming, MN 55092

2023 Fallbrook Avenue and 264th Street Improvements
Infrastructure
Bidding
$330,000 CJ est. value
Wyoming, MN 55092

2023 Fallbrook Avenue and 264th Street Improvements
Infrastructure
Bidding
$330,000 CJ est. value
Wyoming, MN 55092

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

CSAH 19 Reconstruction
Infrastructure
Results
MN

CSAH 23 and CSAH 24 Roundabout
Infrastructure
Results
Chisago City, MN

Coral Bells Solar
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
North Branch, MN 55056

Teal Avenue Solar Garden
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Shafer, MN 55074

Rental Equipment: Road Construction and Maintenance
Term Contract
Post-Bid
$1,500,000 to $2,000,000 est. value

2022 Seal Coat Program
Infrastructure
Results
MN

Helm's Lake Apartments
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Wyoming Township, MN 55013

Last Updated 07/25/2023 03:06 PM
Project Title

2023 Street Improvements

Physical Address View project details and contacts
City, State (County) Harris, MN 55032   (Chisago County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $761,634 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of three rural street improvements, including Ginger Avenue, Harder Avenue, and Falcon Avenue with bituminous paving, and associated work. The work includes the following approximate quantities for construction: Mill Bituminous Pavement (1.5) 160 SY Sawing Bituminous Pavement (Full Depth) 665 LF Remove Bituminous Pavement 245 SY Sawing Concrete Pavement (Full Depth) 30 LF Aggregate Surfacing 1,350 TON Bituminous Pavement (All Mixes) 8,150 TON Subgrade Excavation (EV) 210 CY. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. 60 Plato Boulevard East, Suite 140, St. Paul, MN 55107-1835 The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. OWNER reserves the right to waive any informalities or to reject any or all bids.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents