Similar Projects
AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Repump Station No. 8310 Upgrades and Improvements
Renovation
Bidding
West Palm Beach, FL

Water, Wastewater, Reuse Capital Plan Delivery Program Management Project
New Construction
Bidding
Kissimmee, FL

Airport West Sanitary Sewer Collection
Renovation, Infrastructure
Sub-Bidding
Sebastian, FL

Progressive Design Build Services Lift Station 87
Post-Bid
Saint Petersburg, FL 33731

Effluent Disposal Project
Post-Bid
Chipley, FL

Lanark East Lift Station
Results
Carrabelle, FL

Lift Station, Grease Trap and Septic Tank Pump and Maintenance
Term Contract
Results
Less than $300,000 est. value
Viera, FL 32940

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Lift Station No. 3 Replacement Project
Renovation
Bidding
$790,000 est. value
Plantation, FL 33324

Paradise Village Lift Station
New Construction
Post-Bid
Jacksonville, FL 32220

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Lift Station No. 20 Replacement
Renovation
Bidding
Palm Beach Gardens, FL

Improvements To Lift Stations 393, 1023 And 8168
Renovation
Post-Bid
Belle Glade, West Palm Beach, FL

Last Updated 08/09/2021 02:44 AM
Project Title

2021 Lift Station Rehabilitation Project

Physical Address View project details and contacts
City, State (County) North Port, FL 34287   (Sarasota County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, materials, equipment and incidentals required to construct the City of North Port 2021 Lift Station Rehabilitation Project in its entirety as shown on the Drawings and specified herein including all bypass pumping and other work necessary for a complete installation.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents