Similar Projects
Municipal Bridge Replacement 2 Each - City of Rochelle
Addition, New Construction, Infrastructure, Renovation
Conception
$4,060,000 CJ est. value
Rochelle, IL 61068

Steward Road Bypass Phase 3 - City of Rochelle
Infrastructure
Conception
$27,450,000 CJ est. value
Rochelle, IL 61068

Byron Township Seal Coat
Infrastructure
Design
$81,047 CJ est. value
Byron, IL 61010

3rd Street Reconstruction Project
Infrastructure
Bidding
Oregon, IL 61061

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Watermain Improvements
Infrastructure
Results
$550,661 CJ est. value
Stillman Valley, IL 61084

Watermain Improvements
Infrastructure
Results
$550,661 CJ est. value
Stillman Valley, IL 61084

Resurface and Rehabilitate Existing Airport Entrance Road and Parking Lot - City of Rochelle
Infrastructure
Conception
$320,000 CJ est. value
Rochelle, IL 61068

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

2021 CFP Project
Addition, Infrastructure, Alteration
Results
Forreston, IL 61030

Widening and Extension of the Runway to the West and Displacement of Eastern Runway Edge - City of Rochelle
Infrastructure
Conception
$6,300,000 CJ est. value
Rochelle, IL 61068

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Mill Road Shared-Use Path Extension
Infrastructure
Results
$415,651 est. value
Byron, IL 61010

Caron Road Pavement Resurfacing Project - City of Rochelle
Infrastructure
Conception
$275,000 CJ est. value
Rochelle, IL 61068

Last Updated 07/18/2023 12:20 PM
Project Title

2023 Drainage Improvements

Physical Address View project details and contacts
City, State (County) Monroe Center, IL 61052   (Ogle County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $196,616 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Storm water Improvements, Street/Road Repairs Description: The work covered by these Contract Documents consists of HMA resurfacing, bituminous surface removal, HMA patching, base preparation, sidewalk removal & replacement, and storm sewer improvements and ditch grading along with associated restoration and traffic control. STARTING & COMPLETION: If awarded Contract M0708-7-23-00318, the BIDDER agrees to commence work at the site within 10 consecutive calendar days after date of formal Notice to Proceed. The BIDDER further agrees to complete all work covered by Contract to the point of Substantial Completion by October 13, 2023. The Bidder further agrees to complete all work to the point of final acceptance by the OWNER, and to the point of Final Completion by October 27, 2023.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents