Similar Projects
SRSTC North Section Roadway and Parking Lot Improvements - State of Wisconsin - Department of Health Services
Infrastructure
Design
$2,940,000 CJ est. value
Mauston, WI 53948

Boiler Replacement - State of Wisconsin - Department of Military Affairs
Renovation
Design
$2,959,000 CJ est. value
Mauston, WI 53948

City Of Elroy Main Street Alley And Property Grading
Infrastructure
Post-Bid
$100,000 CJ est. value
Elroy, WI 53929

Sand Ridge Secure Treatment Center Skilled Care Unit Remodel and Expansion
Addition, Demolition, Build-out, Infrastructure
Post-Bid
$9,696,000 CJ est. value
Mauston, WI 53948

GPC - Chapel Remodel/ Camp Williams - State of Wisconsin - Department of Military Affairs
New Construction, Infrastructure
Results
$919,913 CJ est. value
Camp Douglas, WI 54618

GPC - Chapel Remodel/ Camp Williams - State of Wisconsin - Department of Military Affairs
New Construction, Infrastructure
Results
$919,913 CJ est. value
Camp Douglas, WI 54618

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Sidewalk Installation - General Bid
Infrastructure
Construction
$511,600 CJ est. value
Camp Douglas, WI 54618

Arby's / Mauston
New Construction, Infrastructure - 2,676 SF
Pending Verification
$800,000 CJ est. value
Mauston, WI 53948

Pizza Ranch
New Construction, Infrastructure - 8,585 SF
Pending Verification
$2,700,000 CJ est. value
New Lisbon, WI 53950

RFP D/B - Castle Rock Electric Bid
Infrastructure
Post-Bid
$200,000 CJ est. value
Mauston, WI 53948

Replace Ceiling in Tmde and Electronics Room Camp Williams
Renovation
Results
$153,895 CJ est. value
Camp Douglas, WI 54618

Volk Field Main Loop Upgrade
Build-out, Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Camp Douglas, WI 54618

6th Avenue and 28th Street TRIP Project, for Seal Coating
Infrastructure
Results
$31,302 CJ est. value
Cutler, WI 54646

Dees Road at Lyndon Road towards Smith Road (Break) LRIP Project - Double Seal Coat Treatment
Infrastructure
Post-Bid
$200,000 CJ est. value
Lyndon Station, WI 53944

Reported 09/29/2023 12:00 AM
Project Title

Upgrade Electrical Room 140

Physical Address View project details and contacts
City, State (County) Camp Douglas, WI 54618   (Juneau County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction Start Expected 2023,
Bids Due View project details and contacts
Estimated Value $141,500 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of: electrical upgrades at the facility. The major electrical work on the project consists of adding a new transformer and electrical panel to feed new exterior equipment connections and new receptacles in the server area. Project Location: Camp Williams - Building 2 (32ND 13 Brigade Headquarters) 1 Williams Street Camp Douglas, Wisconsin 54618

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents