Similar Projects
SCI Forest - Renovate Water Tower
Renovation
Bidding
$460,000 est. value
PA

Pine and Walnut Street Tank Rehabilitation
Infrastructure
Bidding
$350,000 est. value
Ephrata, PA 17522

Rehabilitation of Linings and Coatings of Sierra East and Sierra West Above Ground Storage Tanks
Post-Bid
Pittsburgh, PA 15123

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Southern Operations and Maintenance Facilities Improvements
New Construction, Addition, Demolition - 118,144 SF
Construction
PA

Construction of a Water Storage Tank
Post-Bid
Beavertown, PA

Bunker Hill Water Storage Tank
Results
Central City, PA 15926

10 MG Reservoir Tank Concrete Vent Curbs and Opening
Post-Bid
New Kensington, PA 15068

Underground Storage Tanks Modification - Victory, Courtland, Southern
Results
Philadelphia, PA

J045--DA Tank Isolation Valve Installation Coatesville VAMC
Post-Bid
Coatesville, PA 19320

Above Ground Storage Tank Modifications
Results
Less than $86,000 est. value
Ingram, Pittsburgh, PA 15205

Adamsburg #1 Potable Waterstorage Tank Painting
Post-Bid
New Stanton, PA 15672

Freedom and 45th Street Tank Rehabilitation Project
Results
Less than $1,475,000 est. value
Freedom, West Mayfield, PA 15010

Last Updated 07/13/2021 03:29 PM
Project Title

Palisades Middle School Tank Top Upgrades

Physical Address View project details and contacts
City, State (County) Kintnersville, PA 18930   (Bucks County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of removal and disposal of concrete and asphalt pads in areas of two (2) underground storage tanks (UST); 1-10,000 gallon and 1-500 gallon. Excavation down to the tops of two (2) UST tans. Blow back all existing product supply lines, and removal of existing sumps and piping. Supply and install fills with containment and overfill; tank sumps with mounting hardware; extractors and tie back into existing vents; probe risers, caps and adapters; suction stubs and tie into existing feeds and returns; all manholes, tank fittings and stone. Supply and install new conduit and wiring from building to tanks and make all connections. Supply and install 1 Veeder Root TLS 350 tank monitor with probes, sensors, modules, start-up and training. Backfill of excavation, form, and pour two (2) tank pads (8” thick, 4,000 psi with fiber mesh) and restore asphalt to existing depth.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents