Similar Projects
Reported | 03/02/2022 12:00 AM |
Project Title | New-Hydronic Heating Condensing Boilers Inspection |
Physical Address | View project details and contacts |
City, State (County) | Roseburg, OR 97471 (Douglas County) |
Category(s) | Professional Services, Single Trades |
Sub-Category(s) | HVAC, Inspection Services |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Eight (8) Boiler Inspections in support of the Roseburg, OR VAMC. Perform annual maintenance and inspections, on two hydronic heating condensing boilers. This is a multi-cell chambered type boiler. Purchase one, two-year annual kits for use for opening both boilers on the fire side. Open inspect & clean the first stage chamber only to determine condition of remaining cells. Clean the first stage burner. Open, inspect & flush the water side clean condensate trap, float and lines. Clean drain line, Neutralizer canister and replace neutralizer Rock Media. Cycle limits, safeties, and operating controls. Check combustion Analysis & Return to factory specifications. Perform annual maintenance and inspections on two hydronic heating condensing boilers. This is a multi-cell chambered type boiler. Purchase one, two-year annual kits to use for opening up both the boilers on the fire side. Open, inspect and clean first stage chamber only to determine condition of remaining cells. Clean first stage burner. Open inspect & flush water side, clean condensate trap, float, and lines. Clean drain line, neutralizer canister and replace neutralizer rock media. Cycle limits, safeties, and operating controls. Check combustion analysis and return to factory specifications. Perform annual maintenance and inspections on two hydronic heating condensing boilers. Open & inspect and clean fire side burner, Open & inspect and flush water side. Clean condensate trap, float and lines. Clean neutralizer canister and replace neutralizer rock media cycle limits, safeties, operating controls, check combustion analysis and return to factory specifications. Perform annual maintenance and inspections on two copper fin tube boilers. Inspect the interior of the boilers, clean & vacuum if necessary. Check for leaks in the water, gas flue and condensate lines. Examine venting system for any obstructions. Check the system water pressure/system piping and expansion tank. Check the fill water meter, test boiler water, check control settings and ignitor. Check wiring & connections. Check the flue gas passageways. Inspect the flame. Inspect & clean the burner. Check the manifold gas pressure. Perform start-up checklist. Replace combustion air filters. Check the relief valve, test low water cutoff operates the relief valve every six months. Perform combustion analysis. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |