Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Rock Creek Campus Kennel AHU Replacement
New Construction
Bidding
Portland, OR 97229

Mcloughlin High School Gym HVAC Renovation
Alteration
Bidding
Milton-Freewater, OR 97862

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Filters, Installation and Coil Cleaning Services
Alteration
Results
$245,000 est. value
Hillsboro, OR

Pioneer Hall AC Replacement
Alteration
Results
$251,293 est. value
Bend, OR 97703

Central Middle School HVAC Upgrade
Alteration
Bidding
Milton-Freewater, OR 97862

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Linn-Benton Community College Main Campus Takena Remodel Project
Alteration
Results
Albany, OR 97321

Boiler BEI Testing and Boiler Tuning
Term Contract
Bidding
Roseburg, OR 97471

Residential HVAC Contractors
Term Contract
Post-Bid
OR

Design-Build for Mechanical or HVAC
Alteration
Results
Springfield, OR 97477

Medford School District MSDEC Annex HVAC Upgrades
Renovation
Post-Bid
Medford, OR 97501

On Demand HVAC Repair Services
Alteration
Results
OR

Reported 03/02/2022 12:00 AM
Project Title

New-Hydronic Heating Condensing Boilers Inspection

Physical Address View project details and contacts
City, State (County) Roseburg, OR 97471   (Douglas County)
Category(s) Professional Services, Single Trades
Sub-Category(s) HVAC, Inspection Services
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Eight (8) Boiler Inspections in support of the Roseburg, OR VAMC. Perform annual maintenance and inspections, on two hydronic heating condensing boilers. This is a multi-cell chambered type boiler. Purchase one, two-year annual kits for use for opening both boilers on the fire side. Open inspect & clean the first stage chamber only to determine condition of remaining cells. Clean the first stage burner. Open, inspect & flush the water side clean condensate trap, float and lines. Clean drain line, Neutralizer canister and replace neutralizer Rock Media. Cycle limits, safeties, and operating controls. Check combustion Analysis & Return to factory specifications. Perform annual maintenance and inspections on two hydronic heating condensing boilers. This is a multi-cell chambered type boiler. Purchase one, two-year annual kits to use for opening up both the boilers on the fire side. Open, inspect and clean first stage chamber only to determine condition of remaining cells. Clean first stage burner. Open inspect & flush water side, clean condensate trap, float, and lines. Clean drain line, neutralizer canister and replace neutralizer rock media. Cycle limits, safeties, and operating controls. Check combustion analysis and return to factory specifications. Perform annual maintenance and inspections on two hydronic heating condensing boilers. Open & inspect and clean fire side burner, Open & inspect and flush water side. Clean condensate trap, float and lines. Clean neutralizer canister and replace neutralizer rock media cycle limits, safeties, operating controls, check combustion analysis and return to factory specifications. Perform annual maintenance and inspections on two copper fin tube boilers. Inspect the interior of the boilers, clean & vacuum if necessary. Check for leaks in the water, gas flue and condensate lines. Examine venting system for any obstructions. Check the system water pressure/system piping and expansion tank. Check the fill water meter, test boiler water, check control settings and ignitor. Check wiring & connections. Check the flue gas passageways. Inspect the flame. Inspect & clean the burner. Check the manifold gas pressure. Perform start-up checklist. Replace combustion air filters. Check the relief valve, test low water cutoff operates the relief valve every six months. Perform combustion analysis.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents