Similar Projects
Forest Hills Park Pumping Station - 1001953 - City Of Tampa
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Tampa, FL 33612

18th Street Pumping Station Rehabilitation - City of Tampa
Renovation
Conception
$5,265,000 CJ est. value
Tampa, FL 33612

Wastewater Pumping Station Rehabilitations Design-Build
Design
Less than $19,000,000 est. value
Tampa, FL 33602

Storm Water Pump Station Repair and Rehabilitation Services, Countywide
Renovation
Post-Bid
$3,292,029 est. value
FL

Construction, Flow Diversion from Falkenburg AWTP to Valrico AWTP
New Construction
Post-Bid
$18,863,000 est. value
Valrico, FL 33594

Tree Tops Lift Station
Renovation
Results
Tampa, FL 33637

Ballast Point Pump Station Force Main Extension
Renovation, Infrastructure
Results
Tampa, FL

Bridgeford Oaks Lift Station Rehabilitation
Construction
$225,000 est. value
Tampa, FL 33637

Capital Improvement - Hillsborough County
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Tampa, FL 33602

DSSC Building Interior Planter Infill Tennis Center Lift Station
Renovation
Post-Bid
Tampa, FL 33614

Low Pressure Sewer System (LPSS) SCADA Equipment Installation and Monitoring
Renovation
Results
$1,575,000 CJ est. value
Tampa, FL 33602

Virginia Pump Station Rehabilitation
Renovation
Post-Bid
$1,120,000 est. value
Tampa, FL

Special Project For Lift Station Upgrades For Colson Elementary
Renovation
Results
Seffner, FL 33584

RFP D/B - Tampa Bay Desalination Facility Intake Connection Improvements - Phase 2
Renovation
Post-Bid
$365,000 CJ est. value
Apollo Beach, FL 33572

Special Project for Lift Station Upgrades for Colson Elementary
Renovation
Results
$300,000 est. value
Seffner, FL 33584

Last Updated 12/01/2022 05:02 PM
Project Title

Tupelo North Lift Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Tampa, FL 33637   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

** As of December 1, 2022, project was awarded to Danus Utilities but awarded amount is not available.** This project includes the rehabilitation of Tupelo North Lift Station with the removal of the existing building structure, rehabilitation of the wet well (new precast well section and top slab), new pumps and lift station piping, new control panels, instrumentation, odor control, and outdoor generator. The inside of the receiving gravity manhole is to be rehabilitated/re-coated. GoToMeeting Link: https://meet.goto.com/CoTT-online-meeting/cott-22-009-prebid-conference DEADLINE FOR CLARIFICATION REQUESTS: 4:30 PM EST on October 25th, 2022 ROJECT OWNER: City of Temple Terrace 11250 North 65 th Street Temple Terrace, Florida 33617 (813) 506-6592 PREPARED BY: Kimley-Horn and Associates 100 2 nd Avenue South St. Petersburg, FL 33701 (727) 547-3999 CONTACT: Michael A Semago, P.E. Mike.Semago@Kimley-Horn.com 100 2 nd Avenue South St. Petersburg, FL 33701 (727) 547-3999 Bid No. 22-009 DEADLINE FOR CLARIFICATION REQUESTS: 4:30 PM EST on November 1, 2022

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents