Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Four Lane Resurfacing - /SUM-IR 480/SR 91-29.69/19.07
Infrastructure
Bidding

Spot Safety - D04 PSIP Phase 2
Post-Bid
Akron, Canton, Youngstown, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Ascot Parkway Improvements
Results
$1,311,489 est. value
Akron, OH 44308

Sunrise Boulevard Infrastructure Improvement
Results
Mogadore, OH 44260

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

2020 Asphalt Resurfacing Program
Results
$1,634,061 est. value
Richfield, OH 44286

Cleveland Massillon Road Improvements
Results
Less than $8,630,000 est. value
Fairlawn, OH 44333

SUM-Cleveland Massillon and Ridgewood Roads
Results
Less than $420,034 est. value
Akron, OH

SR 91 N Turn Lane Improvements
Results
$4,427,510 est. value
Hudson, OH

US 224 Massillon Road Intersection
Results
Less than $497,211 est. value
Akron, OH 44308

Crossings at Golden Link Access Drive
Results
$381,050 est. value
Macedonia, OH 44056

Four Lane Resurfacing - S Van Buren/W Waterloo
Results
Barberton, OH

SUM-CR50-0.00 Resurfacing Project
Results
$1,102,945 est. value
Akron, OH 44319

Reported 09/28/2021 12:00 AM
Project Title

Corporate Woods Circle/Boettler Road

Physical Address View project details and contacts
City, State (County) Green, OH 44685   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $6,077,914
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SUM-SR241-Corporate Woods Circle Phase 2 Construction project to remove existing conventional signalized intersection and replace with a roundabout. Roundabout will have hybrid two (2) lane configuration for Corporate Woods Circle/Thorn Drive. Three (3) lane configuration for SR 241 (Massillon Rd). Approach construction will extend 200 ft. and 400 ft. from the existing intersection. SUM-SR241-Boettler Road/Franks Parkway Phase 3 Construction project to remove existing conventional signalized intersection and replace with a roundabout. Roundabout will have hybrid two (2) lane configuration for Boettler Road/Franks Parkway. Three (3) lane configuration for SR 241 (Massillon Rd). Approach will extend 200 ft. and 400 ft. from the existing intersection

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents