Similar Projects
Well Maintenance and Redevelopment Services
Infrastructure
Bidding

Well Maintenance and Redevelopment Services
Infrastructure
Bidding

Well 11 Improvements
Post-Bid
Livingston, NJ

Well Drilling and Installation Services - Replacement Production Well 21-R
Post-Bid
Parsippany, NJ 07054

Rowan University Edelman Fossil Park Water Management System
Results
$3,437,491 est. value
Sewell, NJ 08080

Electrical and Mechanical Maintenance, Servicing and Repair of Potable Water Wells, Pumping and Related Facilities
Results
Cedar Knolls, NJ 07927

DDTH Pumping Station Project
Construction
Kearny, NJ 07032

Well No. 7 Building
New Construction, Infrastructure
Construction
$2,000,000 est. value
Evesham, NJ

Groundwater Containment Treatment System - Sump Pumps
Term Contract
Pending Verification
Boonton, NJ

Remedial Action at the Former Middlesex County Administration Building
Infrastructure
Bidding
New Brunswick, NJ 08901

Furnish Pump and Motor Repair and Purchase of New Pumps and Motors
Term Contract
Post-Bid
Belmar, NJ 07719

J Street Well House Upgrades
Results
Seaside Park, NJ 08752

Replace Well No. 4
Alteration
Bidding
$1,000,000 to $5,000,000 est. value
Highlands, Sandy Hook, NJ 07732

Hoey Pump Station Force Main Replacement
Post-Bid
Long Branch, NJ 07740

2020 Redevelopment of Well No. 10
Results
Margate City, NJ 08402

Last Updated 01/10/2022 04:37 PM
Project Title

Well No 8 Retrofit

Physical Address View project details and contacts
City, State (County) Burlington Township, NJ   (Burlington County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $89,278
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the furnishing of all labor, material and equipment necessary or required to complete all work set forth in these specifications to have the existing production well, known as Well No. 8, mechanically redeveloped to increase the capacity of the well. The work includes two (2) 8-hour pumping tests at the well to determine the present yield and drawdown of the well and the upgraded capacity of the well upon completion of the work; removal of the existing pump and other equipment; furnishing and installing a new well pump; Installing new highefficiency motors for Well No. 8 and associated wetwell; replacing of worn or defective components prior to reinstallation of the well components or equipment; TV inspection of existing well conditions; well redevelopment using the specified mechanical methods and chemicals; vibration testing and clean-up and site restoration.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents