Last Updated 09/25/2020 08:09 AM
Project Title

Oak Ridge Church Road (Phase 1)

Physical Address View project details and contacts
City, State (County) Tifton, GA   (Tift County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, materials and equipment necessary to construct the proposed Tift County - Oak Ridge Church Road (Phase 1) as shown on the construction drawings. In general, construction consists of +/- 5,000 L.F. of 24-inch curb and gutter, +/- 20 catch basin box construction and miscellaneous concrete placement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents