Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Annual Boiler Service
Term Contract
Bidding
Portland, OR 97214

Annual Boiler Service
Term Contract
Bidding
Portland, OR 97214

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Filters, Installation and Coil Cleaning Services
Alteration
Results
$245,000 est. value
Hillsboro, OR

Pioneer Hall AC Replacement
Alteration
Results
$251,293 est. value
Bend, OR 97703

Mcloughlin High School Gym HVAC Renovation
Alteration
Bidding
Milton-Freewater, OR 97862

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Linn-Benton Community College Main Campus Takena Remodel Project
Alteration
Results
Albany, OR 97321

Central Middle School HVAC Upgrade
Alteration
Bidding
Milton-Freewater, OR 97862

Residential HVAC Contractors
Term Contract
Post-Bid
OR

Design-Build for Mechanical or HVAC
Alteration
Results
Springfield, OR 97477

On-Call and Emergency Mechanical and HVAC Services
Term Contract
Bidding
Less than $50,000 est. value
Redmond, OR

Medford School District MSDEC Annex HVAC Upgrades
Renovation
Post-Bid
Medford, OR 97501

Reported 03/12/2022 12:00 AM
Project Title

Boiler BEI Testing and Boiler Tuning

Physical Address View project details and contacts
City, State (County) Roseburg, OR 97471   (Douglas County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Boiler Safety Device Testing and Boiler Tuning: Contractor shall conduct annual safety device testing to three boilers ( 2-10,000 PPH, 300 HP S/N 4WI-200-300-200 Fire tube boiler and 1- 6,900 PPH, 200 HP S/N CBEX-E-200-200-200ST Fire tube boiler) using the most recent VHA (1810) directive and safety device testing manual, the contractor will make all required adjustment to any and all safety devices that are not in compliance to the safety device manual. The Contractor will do a combustion curve (tunning) at minimum fire 25%, 50%, 75% and 100% fire rate and provide clean emissions for all rates. Upon completion of the tunning the Contractor will ensure that all three boilers will reach their top pounds per hour.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents