Similar Projects
Spring Creek Interceptor Phase 3 - 34-P06 - City of Plano
Infrastructure
Conception
$7,500,000 est. value
Plano, TX

Spring Creek Interceptor Phase 2 - 34-P05 - City of Plano
Alteration
Conception
$9,000,000 est. value
Plano, TX

Southwest Erosion Control
Addition, Alteration - 2,500 SF
Design
$850,000 est. value
McKinney, TX 75071

Paving and Waterline Improvements: Oak Grove Drive and Santa Fe Trail - 37891 - City of Plano
Infrastructure
Design
$1,875,000 est. value
Plano, TX

Metering Infrastructure for Water Utility
Post-Bid
Celina, TX

Sister Grove Regional Water Resource Recovery Facility Outfall Pipeline 1
Post-Bid
Wylie, TX

Trinity Falls East Feed Waterline and Mclarry 36 inch Waterline
Results
McKinney, TX

Louisiana Phase 3 Water Lines
Results
$1,100,000 est. value
Celina, TX

Spring Creek Interceptor Phase 1 - 34-P04 - City of Plano
Infrastructure
Conception
$1,500,000 est. value
Plano, TX

Water Rehabilitation - Steeplechase Estates - 68471 - City of Plano
Infrastructure
Design
$2,000,000 est. value
Plano, TX

Phase 4A/4C - Utilities Package for Bridgewater
Post-Bid
TX

Louisiana Phase 1A Water Lines
Results
$1,097,872 est. value
Celina, TX

Dallas North Trunk - Phase 2 - 46211 - City of Plano
Infrastructure
Conception
$5,000,000 est. value
Plano, TX

Advanced Metering Infrastructure (AMI) System
Post-Bid
McKinney, TX

Water Rehabilitation Cross Creek East 3A
Results
$3,852,000 est. value
Plano, TX

Reported 07/15/2022 12:00 AM
Project Title

Kinney Drive Water Main Replacement

Physical Address View project details and contacts
City, State (County) Murphy, TX 75094   (Collin County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 3,030 LF of 8 water main installed by pipe bursting, 160 LF of 8 water main installed by open cut, 60 linear feet of 8 water installed in 15 steel casing by other than open cut, 23 water services, 9 fire hydrants, 9 - 6 gate valves, and 8 - 8 gate valves.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents