Similar Projects
Galloway Street Railroad Overpass - 441-014 - City of Eau Claire
New Construction, Infrastructure
Conception
$6,600,000 CJ est. value
Eau Claire, WI 54703

Galloway Street Railroad Overpass - 441-014 - City of Eau Claire
New Construction, Infrastructure
Conception
$6,600,000 CJ est. value
Eau Claire, WI 54703

Prairie Heights Residences
New Construction, Infrastructure - 9,168 SF
Design
$40,000,000 CJ est. value
Eau Claire, WI 54703

Menomonie Market Food Co-op
New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Eau Claire, WI 54701

Cannery Park
New Construction, Infrastructure
Bidding
$100,000 CJ est. value
Eau Claire, WI 54703

Cannery Park
New Construction, Infrastructure
Bidding
$100,000 CJ est. value
Eau Claire, WI 54703

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Sanitary Sewer and Watermain Extensions
Infrastructure
Post-Bid
$690,000 est. value
Augusta, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

C. Eau Claire, North Crossing, Jeffers Road Intersection
Infrastructure
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Eleva - Eau Claire - Wisconsin Department of Transportation
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Eau Claire, WI 54701

Eleva - Eau Claire - Wisconsin Department of Transportation
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Eau Claire, WI 54701

Storm Water:Halsey Street Relief Storm Sewer - 405-006 - City of Eau Claire
Infrastructure
Conception
$750,000 CJ est. value
Eau Claire, WI 54701

Last Updated 03/18/2023 05:08 AM
Project Title

Cedar Road Improvements, Balsam Road to Lowes Creek Road WisDOT 2022-2023 LRIP TRI-S Project

Physical Address View project details and contacts
City, State (County) Eau Claire, WI 54701   (Eau Claire County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $676,798 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Clearing and grubbing, removals, sawcut, asphalt pavement pulverizing and relay, excavation, storm sewer culverts, driveways, crushed aggregate base and shoulders, hot mix asphalt pavement, pavement marking, erosion control, traffic control, topsoil/turf/erosion mat/grasses. The work, in general, will include the approximate quantities and items listed below: Clearing and Grubbing 0.70 acres Sawcut 300 lf Excavation 2,550 cy Borrow Excavation 500 cy Culvert Storm Sewer, 12" - 36" HDPE 618 lf Culvert Storm Sewer, 71" x 47" CMP 56 lf Storm Inlet, Type III 1 ea Asphalt Pavement Pulverizing 14,000 sy Crushed Aggregate Base 3,550 cy Crushed Aggregate Base, Shoulders 9,685 lf Concrete Curb and Gutter, 30" Barrier 100 lf Hot Mix Asphalt Pavement, 2" Binder 17,540 sy Hot Mix Asphalt Pavement 2" Surface 17,540 sy Hot Mix Asphalt Pavement, Driveways 430 sy Pavement Marking Lines, 4" Epoxy 10,360 lf Traffic Control 1 ls Topsoil, Turf, Grasses, and Erosion Mat 13,450 sy Riprap, Medium 80 sy This project is part of a WisDOT Local Road Improvement Program (LRIP) TRI-S project, which consists of roadway improvements of existing road including clearing and grubbing, asphalt pavement pulverizing and relay, widening, excavation, storm sewer culverts, driveways, crushed aggregate base, hot mix asphalt pavement, and restoration. The Work will be substantially complete on or before September 1, 2023; final completion on or before October 6, 2023. Location: Cedar Road, Town of Pleasant Valley, Eau Claire County, Wisconsin. The Work includes: a. Excavation b. Trenching, backfilling and compacting c. Asphalt pavement pulverizing d. Clearing and grubbing e. Erosion control f. Traffic control g. Storm sewer culverts h. Sawcut i. Riprap j. Crushed aggregate base k. Hot mix asphalt pavement l. Concrete curb and gutter m. Pavement markings n. Topsoil, turf, grasses, erosion mat Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than five days prior to the date for opening of Bids may not be answered. Russ Kiviniemi, 715-235-9081 or russ.kiviniemi@cedarcorp.com.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents