Similar Projects
CSAH 22 - Baugh Street - Reconstruction From CR 64 To CR 65 - Anoka County
Infrastructure
Conception
$7,970,000 CJ est. value
Nowthen, MN 55330

Highway 169 Frontage/Backage Road Improvements - II-01 - City of Elk River
Infrastructure
Conception
$1,500,000 CJ est. value
Elk River, MN 55330

Median Cable Barrier Installation
Infrastructure
Design
$1,900,000 CJ est. value
Clear Lake, MN 55319

Big Lake Station / Big Lake
New Construction, Infrastructure
Design
$61,000,000 CJ est. value
Big Lake, MN 55309

Otsego Elementary School Parking Lot Improvements
Infrastructure
Bidding
$1,600,000 CJ est. value
Elk River, MN 55330

2023 Business Park Pump Station Improvements
Infrastructure
Bidding
$2,000,000 CJ est. value
Becker, MN 55308

Clearview Elementary Site Improvements
Infrastructure
Post-Bid
$800,000 est. value
Clear Lake, MN 55319

2023 Surface Improvement Projects
Infrastructure
Post-Bid
$450,000 CJ est. value
Orrock Township, MN 55309

2021 Park Improvements
Infrastructure
Results
$592,603 CJ est. value
Saint Augusta, MN 56301

Natures Edge Business Center Third Addition
Infrastructure
Results
$2,000,000 est. value
Elk River, MN 55330

2022 Surface Improvements
Infrastructure
Construction
$3,793,349 CJ est. value
Orrock Township, MN 55309

Norland Truck Sales
New Construction, Infrastructure - 30,300 SF
Pending Verification
$4,000,000 CJ est. value
Big Lake, MN 55309

Community Solar Garden
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Big Lake, MN 55309

Kelley Parkway/Twin Lakes Road/TH 10 Intersection - II-08 - City of Elk River
Infrastructure
Conception
$6,500,000 CJ est. value
Elk River, MN 55330

Nystrom Treatment Facility
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Big Lake, MN 55309

Last Updated 02/01/2023 10:02 AM
Project Title

Water Supply Improvements

Physical Address View project details and contacts
City, State (County) Zimmerman, MN 55398   (Sherburne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $18,959,300 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For Water Supply Improvements The work includes the construction of approximately: 1. A 1,000-gpm pressure filtration water treatment plant 2. Concrete reclaim tank 3. Chemical Feed systems 4. 400,000-gallon elevated storage tank 5. Associated electrical and controls together with numerous related items of work, all in accordance with Plans and Specifications. This project is subject to Prevailing Wage Rates, Buy American Iron and Steel Provisions, Responsible Contractor Certification, and provisions of the Public Facilities Authority Drinking Water Revolving Fund. This project is exempt from Buy America Build America (BABA). The WORK to be performed under this Contract shall consist of furnishing all plant, tools, equipment, materials, supplies, and manufactured articles and for furnishing all transportation and services, including fuel, power, water, and essential communications, and for the performance of all labor, work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The WORK shall be complete, and all work, materials, and services not expressly shown or called for in the Contract Documents which may be necessary for the complete and proper construction of the WORK in good faith shall be performed, furnished, and installed by the CONTRACTOR as though originally so specified or shown, at no increase in cost to the OWNER.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents