Similar Projects
Pittsfield State Office Building Roof Repair - Roof Membrane Leak
Post-Bid
Springfield, MA

National Roofing Program (NRP) Design/Build Nationwide
Post-Bid

Roof Replacement
Results
$2,438,108 to $3,657,163 est. value
Springfield, MA 01152

Roof Replacements at Reeds Village Apartments
Results
$1,441,300 est. value
Springfield, MA

MassMutual Center RTU Replacement - Filed Sub Bid
Post-Bid
Less than $2,200,000 est. value
Springfield, MA

On-Call Roof Repairs
Term Contract
Results
$500,000 est. value
Springfield, MA

Roof Removal and Replacement
Post-Bid
Less than $275,000 est. value
Westfield, MA 01085

Community House Roof and Balustrade Replacement
Results
$65,000 est. value
Longmeadow, MA

Roof Replacement at Burnett Road
Post-Bid
Less than $30,000 est. value
Chicopee, MA 01020

Roof Replacement Phase 1
Results
$83,200 est. value
Brimfield, MA 01010

Replacement of School Roof
Post-Bid
Springfield, MA 01109

Shingle Roof Replacement at Colonial Sunshine Manor 667-4
Results
Less than $148,500 est. value
Ludlow, MA

Roof Replacement
Post-Bid
Springfield, MA 01108

Replacement of the Asphalt Shingle Roofing System
Results
$30,000 est. value
Southwick, MA

PVTA Paratransit Operations and Maintenance Renovation Project - Filed Sub Bid
Post-Bid
Less than $2,400,000 est. value
Springfield, MA 01107

Reported 04/11/2019 12:00 AM
Project Title

New Roof on Learning Center

Physical Address View project details and contacts
City, State (County) Springfield, MA   (Hampden County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description 1. Remove and properly dispose of existing modified Bitumen roofing down to deck. 2. Furnish and install 5.2” polyisocyanurate insulation over deck. 3. Furnish and install Johns Manville 60 mil TPO mechanically attached roofing system (or of equal value) complete with all associated flashings. 4. Furnish and install new pressure treated wood nailers, height to match thickness of the new instillation. 5. Furnish and install new .040” painted aluminum edge metal in accordance with Johns Manville (or of equal value) material requirements. 6. Furnish and install new .032” painted aluminum K-Style machine gutter complete with rain leaders (down spouts) and appropriate attachments. 7. Cut in new reglet at lower roof rising wall and install new flashing around chimney. 8. Install wrapped snow guards over front entrance door only, matching the TTS building. 9. Clean jobsite of all roofing materials. 10. Furnish 20 year Johns Manville (or of equal value) labor and material warranty. 11. Metal edge, gutters and rain leaders (down spouts) will be colored tan to match the TTS building.
Details
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents