Similar Projects
Reported | 09/11/2020 12:00 AM |
Project Title | Coronado High School Main Gym Improvements and Upgrades |
Physical Address | View project details and contacts |
City, State (County) | El Paso, TX 79912 (El Paso County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Work: First Floor: 1. Main Gym: A. Install “Navy Blue” Johnsonsite Vent Covebase #A506, or similar, around the gym wood floor. 2. Guitar Room: A. Remove carpet and padding, clean and prep the concrete floor B. Patch and paint the interior walls "Dover White". C. Acid etch/stain the concrete floor throughout using "Mission Tan" color or similar. D. Apply neutralizer to the treated floor and clear sealer to finish. E. Install new "Navy Blue" vinyl base. Second Floor: 1. Room D201: A. Remove existing vinyl tile and adhesive, clean and prep the concrete floor. B. Patch and paint the interior walls “Dover White”. C. Acid etch/stain the concrete floor throughout using “Mission Tan” color, or similar. D. Apply neutralizer to the treated floor and a clear sealer to finish. E. Paint existing wood base “Navy Blue”. 2. Room D204: A. Patch and paint the interior walls “Dover White”. B. Acid etch/stain the concrete floor throughout using “Mission Tan” color, or similar. C. Apply neutralizer to the treated floor and a clear sealer to finish. D. Install new “Navy Blue” vinyl base. 3. Room D205: A. Patch and paint the interior walls “Dover White”. B. Acid etch/stain the concrete floor throughout using “Mission Tan” color, or similar. C. Apply neutralizer to the treated floor and a clear sealer to finish. D. Install new “Navy Blue” vinyl base. Basement Floor: 1. Piano Room CR G03: A. Patch and paint the interior walls “Dover White”. B. Acid etch/stain the concrete floor throughout using “Mission Tan” color, or similar. C. Apply neutralizer to the treated floor and a clear sealer to finish. D. Install new “Navy Blue” vinyl base. 2. Boy’s Dressing Room & Wrestling Dressing Room: A. Patch and paint the interior walls and ceilings “Dover White”. Stairwalls and Vestibules: 1. North Stairwells (2): A. Patch and paint the interior walls & stair rails “Dover White”. B. Remove and replace the stair treads with new treads. “Black” in color. C. Acid etch/stain the concrete floor throughout using “Mission Tan” color, or similar. D. Apply neutralizer to the treated floor and a clear sealer to finish. E. Install new “Navy Blue” vinyl base on walls. 2. South Stairwell (1): A. Patch and paint the interior walls & stair rails “Dover White”. B. Remove and replace the stair treads with new treads. “Black” in color. C. Acid etch/stain the concrete floor throughout using “Mission Tan” color, or similar. D. Apply neutralizer to the treated floor and a clear sealer to finish. E. Install new “Navy Blue” vinyl base on walls. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |