Similar Projects
Floor Stripping and Waxing
Alteration
Bidding
Cedartown, GA

Painting/Flooring Project Senior Center Complex
Alteration
Bidding
Temple, GA 30179

Floor Covering Replacement for the City Of Dalton Public Works Administrative Building and City Hall
Post-Bid
Dalton, GA 30721

Pete Liakakis Building Floor Repair
Term Contract
Post-Bid
GA

Meadowbrook Elementary Media Center And Music Room Flooring
Results
Augusta, GA 30906

78--Rubber Gym Flooring
Results
Fort Benning, GA 31905

Painting and Flooring
Post-Bid
Demorest, GA 30535

Install Epoxy Floor Covering
Results
Moody AFB, GA 31699

Carpet Annual Contract
Post-Bid
Columbus, GA

Mount Airy Post Office Floor
Results
Mount Airy, GA 30563

Athletic Flooring for Sterling and Greer Elementary
Post-Bid
Brunswick, GA 31525

Carpet Replacement for Moody AFB Fire Station - Building 621
Results
Moody Air Force Base, GA

Gym Floor Refinish
Post-Bid
Rome, GA

Freedom Park K-8 Media Center Flooring
Alteration
Results
Augusta, GA 30905

Installation of Carpet, VCT and Cove Base at Cartersville Middle School
Post-Bid
Cartersville, GA 30120

Reported 04/29/2022 12:00 AM
Project Title

Removal and Installation of Flooring at Magistrate Court and Property and Evidence

Physical Address View project details and contacts
City, State (County) Cumming, GA 30040   (Forsyth County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

• Remove 1,500 sq.’ of VCT & 320 linear foot of cove base • Install 1,500 sq.’ of LVT & 320 linear foot of rubber cove base • Remove 250 sq.’ of carpet & 60 linear foot of cove base • Install 250 sq.’ of slip resistant LVT & 60 linear foot of rubber cove base • Remove existing transitions and install new • Remove carpet from 4 steps/5 risers • Install rubber tread on 4 steps/5 risers • Contractor responsible for moving desk/s, Pepsi machine, benches, X-Ray machine, Screening machine, desk and any other items that need to be relocated to complete the project. All items to be placed back in their original location after work has been completed • Floor to be leveled if needed for install of the new flooring • Contractor to follow Forsyth County Standards • Contractor must obtain a background check on all employees & badges must be wore at all times • Work to be performed on Saturday and Sunday only (Magistrate Court) • Contractor must clean site at the end of each day and remove debris/trash/garbage from site and haul off or obtain a dumpster • Contractor is responsible for his/her own measurements. Numbers provided are an estimate

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents