Similar Projects
N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

Cottonwood Creek Recreation Center Pool Boiler Replacement
Bidding
Colorado Springs, CO 80918

Yellow Brick Boiler Plant Replacement Project
Bidding
Aspen, CO 81611

AFB 2141 CC 2018 Hail Damage Repairs
Post-Bid
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

Sb267 Replace Water Softners Bldg 118
Post-Bid
Pueblo, CO 81003

SB 267 Repair/Upgrade to Mechanical and Electrical Systems
Results
Less than $155,000 est. value
Fruita, CO 81521

H--Boiler Lifespan Assessment
Results
Grand Junction, CO 81501

Pitkin County Library Boiler Replacement
Bidding
CO

Rangeview Boiler Replacement
Post-Bid
Aurora, CO 80013

Fleet Management Exhaust Recovery System Install
Results
Less than $100,000 est. value
Loveland, CO 80537

Eisenhower Tunnel Boiler System Service and Repair
Bidding
Dillon, CO

Greeley Central HS Boiler and DHW Replacements
Post-Bid
Garden City, CO 80631

Seven Lakes Restroom Renovation
Results
$300,000 to $400,000 est. value
Loveland, CO 80538

Cu Anschutz Pn19-129407-Scpp Pre-Qualified Only
Post-Bid
Less than $220,238 est. value
Denver, CO

Reported 04/29/2021 12:00 AM
Project Title

Boiler Wet Line Return Repairs

Physical Address View project details and contacts
City, State (County) Greeley, CO 80631   (Weld County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Shut down and isolate both steam boilers with corroded wet return piping/fittings 2. Disconnect & remove section of corroded/bad wet return pipe at boiler from existing flanges/piping as shown by Project Manager. 3. Furnish & install new Sch. 40 iron pipe and weld/flanged fittings for new section of boiler wet returns. 4. Reconnect wet return drops, flanges, etc. to existing drops/flanges, etc. and check for leaks 5. Provide/install insulation on all pipe/fittings 6. Provide all tools, labor & materials required to complete above scope of work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents