Similar Projects
Last Updated 01/15/2021 06:17 AM
Project Title

Pavement Marking - D01 PM FY21

Physical Address View project details and contacts
City, State (County) (Allen, Defiance, Hancock, Hardin, Paulding, Putnam, Van Wert, Wyandot Counties)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improving Various Sections In The Counties Of Defiance, Paulding, Van Wert, Putnam, Hancock, Hardin, Wyandot, And Allen, In Ohio, In Accordance With Plans And Specifications By Applying New Pavement Markings District-Wide. Section 0001 Erosion Control Line Alt Item Code Item Description Wt Unit Quantity 0001 832e30000 Erosion Control (Wt: 08) 08 Each 1,000.000 Section 0002 Traffic Control Line Alt Item Code Item Description Wt Unit Quantity 0002 642e00104 Edge Line, 6", Type 1, Work Order (Wt: 45) 45 Mile 200.000 0003 642e00200 Lane Line, 4", Type 1, Work Order (Wt: 45) 45 Mile 10.000 0004 642e00204 Lane Line, 6", Type 1, Black Contrast (Wt: 45) 45 Mile 22.120 0005 642e00204 Lane Line, 6", Type 1, Work Order (Wt: 45) 45 Mile 10.000 0006 642e00300 Center Line, Type 1, Work Order (Wt: 45) 45 Mile 100.000 0007 642e00400 Channelizing Line, 8", Type 1 (Wt: 45) 45 Ft 25,000.000 0008 642e00404 Channelizing Line, 12", Type 1 (Wt: 45) 45 Ft 35,000.000 0009 642e00500 Stop Line, Type 1 (Wt: 45) 45 Ft 8,000.000 0010 642e00600 Crosswalk Line, Type 1 (Wt: 45) 45 Ft 6,000.000 0011 642e00700 Transverse/Diagonal Line, Type 1 (Wt: 45) 45 Ft 6,000.000 0012 642e01000 Railroad Symbol Marking, Type 1 (Wt: 45) 45 Each 16.000 0013 642e01110 School Symbol Marking, 96", Type 1 (Wt: 45) 45 Each 10.000 0014 642e01300 Lane Arrow, Type 1 (Wt: 45) 45 Each 500.000 0015 642e01500 Dotted Line, 4", Type 1 (Wt: 45) 45 Ft 1,400.000 0016 642e01510 Dotted Line, 6", Type 1 (Wt: 45) 45 Ft 100,000.000 0017 642e01602 Bike Lane Symbol Marking, Type 1 (Wt: 45) 45 Each 2.000 0018 643e00104 Edge Line, 6" (Wt: 45) 45 Mile 778.560 0019 643e00105 Edge Line, 6", As Per Plan (Wt: 45) 45 Mile 200.640 0020 643e00204 Lane Line, 6" (Wt: 45) 45 Mile 79.530 0021 643e00300 Center Line (Wt: 45) 45 Mile 395.660 0022 690e98000 Special - Fourteen Day (14) Work Order (Wt: Nr) Nr Each 8.000 0023 690e98000 Special - Seventy Two Hour (72) Work Order (Wt: Nr) Nr Each 8.000 Section 0003 Maintenance Of Traffic Line Alt Item Code Item Description Wt Unit Quantity 0024 614e11110 Law Enforcement Officer With Patrol Car For Assistance (Wt: 39) 39 Hour 50.000 Section 0004 Incidentals Line Alt Item Code Item Description Wt Unit Quantity 0025 103e05000 Premium For Contract Performance Bond And For Payment Bond Ls 1.000 (Wt: Nr) Nr 0026 614e11000 Maintaining Traffic (Wt: 39) 39 Ls 1.000 0027 624e10000 Mobilization (Wt: Nr) Nr Ls 1.000

Details

Division 32 - Exterior Improvements, Paving Specialties, Pavement Markings, Painted Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents