Similar Projects
UNC Chapel Hill – Health Sciences Library 4Th Floor Renovations
Post-Bid
Chapel Hill, NC 27514

Morehead Planetarium and Science Center Renovation
Renovation
Post-Bid
Chapel Hill, NC 27514

UNC Art Lab Renovations
Results
Chapel Hill, NC

UNC Sheps Center Renovation
Results
Chapel Hill, NC

Taylor Campus Health Sports Medicine Renovation
Renovation - 12,000 SF
Construction
$1,900,000 to $2,225,508 est. value
Chapel Hill, NC 27599

Faculty Recruitment Laboratory Renovations - Lineberger Cancer Research Center
Renovation
Construction
$800,000 to $1,000,000 est. value
Chapel Hill, NC

UNC-Ch Mej 6Th Floor Satellite Housing Renovation
Renovation
Post-Bid
Chapel Hill, NC 27514

Renovation of Student Lounge Into Student Gaming Room for Esports - Craige Residence Hall
Renovation
Results
Chapel Hill, NC 27514

Human Structures Swing Space Modifications
Renovation
Construction
Chapel Hill, NC 27514

UNC Chapel Hill - MMRRC Facility MBRB Room 2304
Post-Bid
Chapel Hill, NC 27514

Renovations to the 4th Floor of the Burnett-Womack Building
Renovation
Results
Chapel Hill, NC

Peabody Hall Lobby Interior Renovations
Construction
Chapel Hill, NC 27514

UNC - CH Hamilton Hall Toilet Renovation
Renovation
Post-Bid
Chapel Hill, NC 27514

Pod 1B Cafe and Commons Renovation
Results
Chapel Hill, NC

Medical Education Building
Construction
Chapel Hill, NC 27599

Reported 01/17/2020 12:00 AM
Project Title

UNC EHS Building EOC Office Renovations

Physical Address View project details and contacts
City, State (County) Chapel Hill, NC 27514   (Orange County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK Remodel existing 1st floor EOC (Emergency Operations Center) storage space at UNC EHS (Environmental, Health and Safety) Building. A partition will be added to the space (to top of structure) to separate the storage space from the new office suite. The non-suite side of the wall will remain unfinished, but electrical and HVAC provisions will be made to that space. A new 4'-wide double door will be added to the corridor for access to this space. Work to the suite-side of the wall includes an office buildout and provisions for modular workstations. Millwork with solid surface countertop will be added to the space. An opening will be cut into the existing exterior wall for the placement of the new window. It is unknown if a header exists for this window. A structural detail has been included if structural modifications are required for window installation. Brick will need to be removed and reinstalled. The decorative horizontal fins at the existing windows are not part of the project scope for the new window. The door and frame into this space will be removed; replace with a similar door (opposite-hand swing.) Gypsum wall will be removed at the existing exterior wall. Upon removal, notify Project Manager of areas that are damaged or need to be remedied prior to replacement of gypsum board. Install 95-inch Owner provided monitor at suite-side partition wall. Coordinate location and blocking with Architect. Finishes in this space are indicated on drawings. An existing storage closet will be converted into a kitchenette area including cabinets, solid surface countertop, sink, ice maker, refrigerator. Walls, ceiling and floors in this area will match the adjacent hallway. Doors and frame will be removed; the opening will be finished with gypsum board, paint and rubber base. Alternates have been included for Owner consideration.

Details

College/University, Approximately 5,000 SF Renovation, Levels.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents