Similar Projects
Wealthy Street - Ethel Avenue to East City Limit - City of Grand Rapids
Infrastructure
Conception
$936,320 est. value
Grand Rapids, MI 49525

Fuller Avenue - Knapp Street to 3 Mile Road - City of Grand Rapids
Infrastructure
Conception
$316,763 est. value
Grand Rapids, MI 49525

MoTown Square Affordable Assisted Living
New Construction, Infrastructure
Design
$14,000,000 CJ est. value
Grand Rapids, MI 49507

Woods of Albright - Phase 2
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Grandville, MI 49418

GRCC ATC Piazza Stair and Ramp Addition
Infrastructure, Alteration
Post-Bid
Grand Rapids, MI 49503

Sidewalk Repair - 2022
Alteration
Post-Bid
Kentwood, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Kent ISD Parking Lot 5 Sidewalk
Infrastructure
Results
Grand Rapids, MI 49525

PNC Bank Branch No. B605
Renovation
Construction
Kentwood, MI 49508

PNC Bank Branch No. B703 Cascade
Renovation
Construction
Grand Rapids, MI 49546

Breton Grove Apartments
New Construction, Infrastructure - 16,395 SF
Pending Verification
$5,000,000 CJ est. value
Grand Rapids, MI 49508

The Flats at Metro Health Village
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Wyoming, MI 49519

Ottawa Avenue _ Hastings Street to Newberry Street - City of Grand Rapids
Infrastructure
Conception
$400,000 est. value
Grand Rapids, MI 49503

Speedway #7535 Rebuild / Grand Rapids
Addition, Demolition, New Construction, Infrastructure - 5,600 SF
Design
$1,300,000 CJ est. value
Grand Rapids, MI 49505

Rockford Public Schools-Bp#9 Cannonsburg & Lakes Paving
Alteration
Post-Bid
Rockford, MI

Last Updated 03/13/2023 02:04 PM
Project Title

Sidewalk Rehabilitation and Replacement Program - Cedar Springs 5th Street

Physical Address View project details and contacts
City, State (County) Cedar Springs, MI 49319   (Kent County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $364,915 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 13, 2023, the project has been awarded. Construction is expected to commence May 31, 2023. The Kent County Purchasing Division, on behalf of Cedar Springs is soliciting bids for a sidewalk rehabilitation and replacement program in the City of Cedar Springs on 5th Street from Muskegon St. to Pine St. and a section on 7th St. The Awarded entity will be required to obtain permits for this project. This award will be funded by Kent County's Community Development Block Grant ("CDBG"). All Tree cutting/clearing must be completed by March 31, 2023. 56 days to complete construction once work begins (does not include days needed for tree cutting/clearing). Construction must be substantially completed by May 31, 2023. The approximate quantities of the major items of Work are: 660 SYD Remove Concrete Sidewalk and Driveway 26,800 SFT 4" and 6" Concrete Sidewalk and Driveway 5,200 LF Lawn Restoration 65 TON HMA - Hand Patch and Driveways Dimensions, if furnished, are for general reference only and should be verified by Respondents.. Inquiries Deadline Date & Time (local) 1/6/2023, 2 PM No Bid Bond is required if a bid is less than $500,000. Each bid over $500,000 must be accompanied by a Bid Bond executed by the Respondent and payable to County of Kent for five percent (5%) of the total amount of the bid. Attorneys-in-fact who sign Bid Bonds or Payment Bonds and Performance Bonds must file a certified effective dated copy of their Power of Attorney. A certified check, bank draft, cashier's check, or negotiable U.S. Government bond (at par value) may be submitted In lieu of a Bid Bond. Personal checks are NOT acceptable. The Bid Bonds of the unsuccessful Respondents will be returned after the Solicitation is awarded. The Bid Bond of the successful Respondent will be retained until the contract is fully executed by all parties involved. Each contract over $50,000 must be accompanied by a Performance Bond and a Payment Bond, each payable to the Owner (County of Kent) and each in the amount of 100 percent (100%) of the contract price with a corporate surety approved by the funding agency, for the faithful performance of the contract. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents