Similar Projects
West Warren/Canal Street - 408R-0069 - City Of Lebanon
Infrastructure
Conception
$395,000 est. value
Lebanon, OH 45036

Commerce Drive Extension Project
Infrastructure
Bidding
$3,700,000 est. value
Defiance, OH 43512

Mill Creek Restoration and Kerruish Basin Modifications
Infrastructure
Bidding
$3,000,000 est. value
Cleveland, OH

Main Street Improvements Phase II
Post-Bid
$1 to $311,500 est. value
Stoutsville, OH 43154

Lincoln Avenue Improvements
Post-Bid
$1 to $287,800 est. value
Pleasantville, OH

Stormwater Control Measures Maintenance
Results
Cincinnati, OH 45202

The colony South Storm and Water Relocations
Results
Toledo, OH

Industrial Corridor Pump Station and Force Main
New Construction
Construction
Ironton, OH 45638

Lakeview Meadows MHP - Park Expansion
Addition, Infrastructure - 2,997,013 SF
Construction
Lakeview, OH 43331

Summit Street Storm Sewer Separation
Infrastructure
Bidding
$43,220 est. value
Defiance, OH 43512

Storm Sewer Improvements
Infrastructure
Post-Bid
Fostoria, OH

2021 Various Stormwater Improvements Project
Results
Lima, OH

Jackson Street Jefferson Street and Church Street Water Line Replacement
Infrastructure
Post-Bid
$757,000 est. value
West Unity, OH 43570

Sewer Manhole and Sewer Main Rehabilitation - Phase 1 Project
Results
Less than $135,000 est. value
Lebanon, OH

Miner Drive Storm Sewers
Infrastructure
Post-Bid
$1,150,000 est. value
Brunswick, OH 44212

Last Updated 07/22/2022 05:58 AM
Project Title

2022 Hills and Dales Storm Sewer Pipe Replacement Project

Physical Address View project details and contacts
City, State (County) Massillon, OH   (Stark County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $136,500 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Massillon, Ohio. Completed plans call for site work for a water / sewer project. For all labor, material, and services necessary for 2022 Hills & Dales Storm sewer Pipe Replacement Project (the Project), as more fully described in the Contract Documents prepared by the City of Massillon, (Design Professional). Subject to the right of the Owner to reject any or all bids, the Owner will award contracts to the bidder(s) submitting the lowest and best bid(s). Direct questions about the Project to Gregory A. McCue, Civil Engineer IV, Municipal Government Center Annex, The City Administration Building, 151 Lincoln Way East, Massillon, Oh, 44646, (330) 830-1722. All bids must be accompanied by a Bid Guaranty in the form of either a Bid Guaranty and Contract Bond for the full amount of the bid (including all add alternates) or a certified check, cashier's check, or an irrevocable letter of credit in an amount equal to 10% of the bid (including all add alternates), as described in the Instructions to Bidders. Bidders are also requested to provide a copy of his/her company's liability insurance certificate with a minimum coverage of one million dollars ($1,000,000.00) when bid is submitted. Each proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. All steel products must meet the requirements of ODOT CMS 106.09. Additionally, contractor compliance with the equal employment opportunity requirements of the Ohio Administrative Code Chapter 123, the Governor's Executive Order of 1972, and Governor's Executive Order 84-9 shall be required. This is a prevailing wage project. Bidders must comply with the prevailing wage rates on Public Improvements in Stark County and the City of Massillon, Ohio as determined by the Ohio Bureau of Employment Services, Wage and Hour Division, (614) 644-2239. No Bidder may withdraw its bid within sixty (60) days after the bid opening. The Owner reserves the right to waive irregularities in bids, to reject any or all bids, and to conduct such investigation as necessary to determine the lowest and best bidder for each contract.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents