Similar Projects
Margate Park Improvements - City of Daly City
Infrastructure
Conception
$5,000,000 est. value
Daly City, CA 94015

Story/Jackson Safety Improvements - City of San Jose
Infrastructure
Conception
$1,630,000 est. value
San Jose, CA 95122

Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Panoche Road Bridge Over Tres Pinos Creek-Scour Countermeasure - San Benito County
Infrastructure
Conception
$3,658,001 CJ est. value
Paicines, CA 95043

Cienega Road - Mudstone Ranch to Bird Creek - San Benito County
Infrastructure
Conception
$807,790 CJ est. value
Hollister, CA 95023

Fairview Road CIR Santana Ranch to 200' South Santa Ana Creek Bridge - San Benito County
Infrastructure
Conception
$966,052 CJ est. value
Hollister, CA 95023

Rinconada Park Improvements - PE-08001 - City of Palo Alto
Infrastructure
Conception
$9,801,144 CJ est. value
East Palo Alto, CA 94303

Vineyard Avenue Pavement Rehabilitation: I-10 Freeway to Holt Boulevard - City of Ontario
Infrastructure
Conception
$445,000 CJ est. value
Rancho Cucamonga, CA 91730

Fourth Street Pavement Rehabilitation: Archibald Avenue to Haven Avenue - City of Ontario
Infrastructure
Conception
$670,000 CJ est. value
Rancho Cucamonga, CA 91730

Rebuild Underground District 16 - EL-13003 - City of Palo Alto
Infrastructure
Conception
$1,080,448 CJ est. value
East Palo Alto, CA 94303

Hope Street and Villa Street Traffic Signal Installation - City of Mountain View
Infrastructure
Conception
$1,070,000 CJ est. value
Mountain View, CA 94041

Stevens Creek Trail Bridge Over Central Expressway and Evelyn Avenue Deck Replacement and Painting - 22-35 - City of Mountain View
Infrastructure
Conception
$4,850,000 CJ est. value
Mountain View, CA 94043

Hamilton Avenue Highway 17 Southbound Offramp - 21-XX - City of Campbell
Infrastructure
Conception
$3,007,000 CJ est. value
San Jose, CA 95125

Campbell Avenue And Page Street Traffic Signal - 20-DD - City Of Campbell
Infrastructure
Conception
$332,000 CJ est. value
Campbell, CA 95008

Well 20 Bon View/Schaefer Project - City Of Chino
Infrastructure
Conception
$5,500,000 CJ est. value
Chino, CA 91710

Last Updated 09/19/2023 12:05 PM
Project Title

RFQ Contractor - Jail Expansion Project

Physical Address View project details and contacts
City, State (County) Jackson, CA 95642   (Amador County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Prison/Jail, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $23,470,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes, but is not limited to, the construction of Jail Expansion The proposed project consists of a new two-story jail facility with a partial basement. The new building is approximately 12,700 sq, ft. in area and will be Type I-A construction with Occupancy Group I-3 and will be fully sprinklered. The new jail facility will house cells, dayrooms, program treatment rooms, a dental room, exam rooms, offices, recreation yards, a control room, mechanical equipment rooms, and corridors. Also included in the scope of work will be associated site structures including a Mobile Command Structure and site retaining walls. The jail structure will be constructed of structural steel framing with metal decking at the roof levels and a poured-in-place structural concrete slab at the upper tier level. The ground floor level, over the partial basement area, will be constructed of structural steel framing supporting a composite concrete and metal deck slab. The remainder of the first-floor area will consist of a concrete slab-on-grade. The roof and elevated floors will be supported by concrete masonry bearing walls that will also act as the lateral force resisting system for the structure. Poured-in-place concrete retaining walls will be incorporated at the basement level at locations where the soil is to be retained. The foundation for the structure will consist of typical continuous spread footings. The exterior finish of the building will be split-faced masonry and EIFS over rigid insulation. Contractor License Required: Class B SFM App No. 19-N-1080-CP-PR SFM File No. 40-03-44-0040-10001 Questions must be received no later than Thursday, August 17, 2023, at 5:00 p.m Any questions regarding this Amendment please e-mail www.publicpurchase.com.

Details

14,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents