Similar Projects
Recreation and Units Building Drainage Improvements
Infrastructure
Post-Bid
Ellisville, MS

Repair and Maintenance Unit Price Project
Infrastructure
Post-Bid
Gulfport, MS

Loyd Star Attendance Center Drainage and Grading Improvements
Results
$125,160 est. value
Wesson, MS 39191

Carroll County County Road 333 EWP Bank Stabilization
Results
MS

JSU Plaza Trench Drain
Infrastructure
Post-Bid
Jackson, MS

Lanier High School Parking Improvements and JROTC Drainage Repair
Results
Jackson, MS 39203

Pavilion Vaught-Hemingway Stadium Drainage Corrections
Infrastructure
Post-Bid
Oxford, MS 38655

Vicksburg Waterline Protection Project
Results
$998,000 est. value
Vicksburg, MS

Riprap Stream Bank Stabilization Project
Infrastructure
Post-Bid
Lumberton, MS

Windsor Park Drainage Conservation Project
Results
$625,234 est. value
Pascagoula, MS

County Road 136 Slide Repair
Infrastructure
Post-Bid
Pittsboro, MS

Rehabilitate Airfield Drainage, Phase 1B Gulfport-Biloxi International Airport
Results
$1,500,000 to $1,800,000 est. value
Gulfport, MS 39501

Emergency Watershed Protection Program - Streambank Stabilization and Channel/Sediment Removal
Infrastructure
Post-Bid
MS

Box Culvert Spillway Sealing
Results
$95,160 est. value
Byram, MS

Annual Contract for Concrete Culvert
Term Contract
Post-Bid
Pascagoula, MS

Last Updated 11/04/2022 09:25 AM
Project Title

Publicly Owned Treatment Works (POTW) Equalization Basin and Lagoon Improvements

Physical Address View project details and contacts
City, State (County) Carthage, MS 39051   (Leake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bids are for construction of an equalization basin at the City of Carthage POTW (Sewage Lagoon) and improvements to the existing lagoon levee system. Work shall include, but not be limited to, clearing and grubbing, earthwork and grading, construction of concrete spillway, installation of 8 gravity sewer outfall piping and manholes, and repairs and armoring of existing lagoon levees. The total Contract Time will be 150 consecutive calendar days and the liquidated damages will be $500.00 per consecutive calendar day thereafter. All bids submitted in excess of $50,000 by a Prime or Subcontractor to do any erection, building, construction, repair, maintenance, or related work must be in compliance with and subject to Sections 31-3-15 and 31-3-21 of the Mississippi Code of 1972 as annotated and amended, and in all case law pertaining thereto. Award will be made to the lowest and best bidder and the City of Carthage Board of Alderman reserves the right to reject any and all bids and to waive any and all informalities. If any envelope is not so marked, said bid shall not be opened or considered.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents