Similar Projects
MATOC IDIQ for Control Systems Installations at Hydroelectric Facilities for The U.S. Army Corps of Engineers, South Atlantic Division
Term Contract
Post-Bid
Less than $20,000,000 est. value

Storm Rates Overhead Line Construction 2022
Infrastructure
Post-Bid

Steel Transmission Poles for the Circuit 838 Structures #5, 6, 7, 10, and 11 Replacement
Results
Less than $228,975 est. value
Jacksonville, FL

Electrical Contractor Services
Term Contract, Alteration
Results
Jacksonville, FL

Brandy Branch Generating Station - ST4 Excitation Transformer Replacement
Alteration
Post-Bid
Jacksonville, FL

Northside Generating Station Bi-Directional Amplifier Supply and Installation
Alteration
Results
Jacksonville, FL 32226

Generator Inspection and Preventative Maintenance Services
Term Contract
Post-Bid
Jacksonville, FL

Multi-Site LED Conversion - Front / Back Porch Lighting
Alteration
Results
Jacksonville, FL

Facilities Automatic Transfer Switch (ATS) Maintenance and Repair Services
Term Contract, Alteration
Post-Bid

230 kV to 34.5 kV Transformer for Steelbald Substation
Alteration
Results
Jacksonville, FL

Electrical Work, Roadway Signing
Infrastructure
Post-Bid
$839,431 CJ est. value
Jacksonville, FL 32257

911 Call Center Renovation Project (Electrical and Cabling Installation)
Renovation
Results
$65,000 est. value
Jacksonville, FL 32207

Cathodic Protection Systems Berths 16 and 17 Dames Point Marine Terminal
Alteration
Post-Bid
$660,000 est. value
Jacksonville, FL 32226

Design-Build Services for Circuits 853/822 Tower 39 Foundation
Alteration
Results
Jacksonville, FL

RFP D/B - Myrtle Avenue Operations Campus Generator Replacement
Renovation
Post-Bid
$740,573 CJ est. value
Jacksonville, FL 32202

Last Updated 05/10/2023 02:07 PM
Project Title

San Pablo Parkway - New Traffic Signals Construction

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32224   (Duval County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work Covered by the Plans and Specifications Consists of Furnishing All Labor, materials, And Equipment; and Performing All Operations Necessary to Install New Traffic Signals and Associated Equipment on San Pablo Parkway at and Near the Intersections and Surrounding Areas of Sam yapez Road and Old San Pablo Road South. The Work Includes, but is Not Limited To, Mast Arms, Traffic Signals, Pedestrian Poles, Fiber Optic Cable, Electrical Cable, Its Poles And Devices, Ada Curb Ramps, Pavement markings, and All Other Devices and Components Shown In Accordance With the Contract Drawings and Specifications. Deadline for Questions: Monday, May 1, 2023 at 4:00 p.m. Email questions to David Klages, Purchasing Analyst, at dklages@coj.net.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents