Similar Projects
Edison High School Exterior Painting
Renovation
Sub-Bidding
$650,000 CJ est. value
Fresno, CA 93706

Industrial Coating Services - Phase II
Renovation
Sub-Bidding
$750,000 CJ est. value
Hollister, CA 95023

Golden Valley High School Exterior Painting
Alteration
Post-Bid
Merced, CA 95341

East Campus Educational Center Exterior Painting
Alteration
Post-Bid
Merced, CA 95340

New City Yard Install Erect City Furnished Storage Covering
Alteration
Results
Yucaipa, CA 92399

RCD First Floor Window Painting
Alteration
Results
$91,000 est. value
Oakland, CA 94612

Painting Project At Ayala High School and Briggs
Renovation
Construction
$484,800 CJ est. value
Chino Hills, CA 91709

Interior Painting Project at John Swett Elementary School
Renovation
Sub-Bidding
$300,000 CJ est. value
Martinez, CA 94553

Atwater High School Exterior Painting
Alteration
Post-Bid
Atwater, CA 95301

Liberal Arts Phase 1 Upgrade
Alteration
Results
$400,000 to $600,000 est. value
Pleasant Hill, CA 94523

Mohr Elementary Campus Wide Exterior Painting
Alteration
Post-Bid
Pleasanton, CA 94588

Painting Services - Interior and Exterior
Term Contract
Results
San Ramon, CA

2022 Plant Coating Project
Infrastructure, Alteration
Post-Bid
Truckee, CA

Painting and Wallcovering Services
Term Contract, Alteration
Results
Palm Springs, CA 92262

Valley View Elementary School Exterior Painting
Alteration
Post-Bid
Pleasanton, CA 94566

Last Updated 07/13/2023 07:07 AM
Project Title

Exterior Painting Project - John Swett Elementary School

Physical Address View project details and contacts
City, State (County) Martinez, CA 94553   (Contra Costa County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $110,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of painting preparation and new paint on 5 buildings located at 4955 Alhambra Valley Rd, Martinez, CA 94553. The District intends to close the work area to the Public for the project duration. A notice of award will be issued within 90 days after the bid due date. The awarded contractor will be issued a notice to proceed within 90 days following notice of award. In the event 90 days are exceeded the District will not be subject to claim. At that time or before the contractor will provide a submittal for all products intended to be used on the project. To bid on this Project, the Bidder is required to be registered as a public works contractor with the Department of Industrial Relations and to possess one or more of the following State of California Contractor Licenses: [C-33]. The Bidder's license(s) must remain active and in good standing throughout the term of the Contract. A bid bond by an admitted surety insurer on the form provided by the District a cashier's check or a certified check, drawn to the order of the Martinez Unified School District, in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Work. The successful Bidder may substitute securities for any monies withheld by the District to ensure performance under the Contract, in accordance with the provisions of section 22300 of the Public Contract Code. The successful Bidder shall comply with all requirements of Division 2, Part 7, Chapter 1, of the Labor Code and Title 8 of the California Code of Regulations. For all work performed pursuant to this Contract, the Contractor and all subcontractors shall pay all workers not less than the general prevailing rate of per diem wages and for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of California, ("DIR") for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to sections 1770 et seq. of the California Labor Code. Prevailing wage rates are also available from the District or the DIR website. The Bidder and all Subcontractors under the Bidder shall comply with applicable federal, State, and local requirements relating to COVID-19 or other public health emergency/epidemic/pandemic including, if required, preparing, posting, and implementing a Social Distancing Protocol. The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents