Similar Projects
HVAC And Structural
Term Contract
Bidding
Carbondale, IL

Building Addition, Roof Replacement, And HVAC Replacement
Addition, Infrastructure - 1,600 SF
Bidding
Carbondale, Murphysboro, IL 62966

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Century School HVAC Replacement
Alteration
Bidding
Carbondale, IL

HVAC and Mechanical Products
Term Contract
Post-Bid

Murphysboro Middle School HVAC Replacement - Phase 3
Renovation
Results
Murphysboro, IL 62966

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Trico School Athletic Facility
New Construction
Results
$550,000 est. value
Campbell Hill, IL 62916

Weatherization (IHWAP) Program
Term Contract
Post-Bid

PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Results
Lexington, KY 40506

HVAC Equipment Replacement
Alteration
Post-Bid
$450,000 to $500,000 est. value
Carbondale, IL

Gym Roof Replacement
Alteration
Results
Murphysboro, IL 62966

Last Updated 02/04/2022 12:23 PM
Project Title

Trico Schools HVAC Replacement

Physical Address View project details and contacts
City, State (County) Campbell Hill, IL 62916   (Jackson County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, HVAC, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work covered by the Abatement Base Bid at the high school (no work at the elementary school) includes the complete removal of approximately 170 linear feet of piping wrapped in asbestos containing insulation via the gross removal method. Work covered by the Mechanical Base Bid includes at the high school the partial demolition of the existing corridor plaster ceiling, lighting fixtures, cutting of new masonry wall penetrations for new ductwork, hydronic heat piping, ceiling and wall mounted ventilating heat pump system, and residential window units. New work at the high school includes the installation of a new 2x2 ACT ceilings, LED light fixtures, roof mounted DOAS unit, roof mounted condensing units, EPDM roof patching, structural reinforcing, new gypsum soffit, new gas piping, and interior and exterior painting for five classrooms and the corridor. Work covered at the elementary school the demolition of the existing corridor ACT ceiling, lighting fixtures, cutting of new masonry wall penetrations for new ductwork, floor mounted packaged HVAC units, and flooring in seven classrooms. New work at the elementary school includes the installation of a new 2x2 ACT ceilings, LED light fixtures, roof mounted DOAS unit, roof mounted condensing units, wall-mounted mini-split units, new gas service and piping, EPDM roof patching, structural reinforcing, and interior and exterior painting for twelve classrooms and the corridor. Corresponding Structural, Mechanical, Electrical, and Plumbing Systems will also be included. Work covered by the Alternate Bid #HS-1 at the high school includes the installation of new roof mounted condensing units, EPDM roof patching, and interior painting for four classrooms and the office areas. Corresponding Mechanical, Electrical, and Plumbing Systems will also be included. Work covered by the Alternate Bid #ES-1 at the elementary school includes the demolition of the existing ACT ceiling, lighting fixtures, cutting of new stud wall penetrations for new ductwork, and two roof mounted packaged HVAC units in the Pre-K area. New work in the Pre-K area includes the installation of a new 2x2 ACT ceilings, LED light fixtures, roof mounted DOAS unit, roof mounted condensing units, ceiling-mounted cassette units, EPDM roof patching, structural reinforcing, and interior and exterior painting for two classrooms and all adjacent spaces. Corresponding Mechanical, Electrical, and Plumbing Systems will also be included. Work covered by the Alternate Bid #ES-2 includes the demolition of the existing corridor ACT ceiling, lighting fixtures, cutting of new masonry wall penetrations for new ductwork, floor mounted packaged HVAC units, and flooring in seven classrooms. New work at the elementary school includes the installation of a new 2x2 ACT ceilings, LED light fixtures, roof mounted DOAS unit, roof mounted condensing units, wall-mounted mini-split units, EPDM roof patching, structural reinforcing, and interior and exterior painting for twelve classrooms and the corridor. Corresponding Mechanical, Electrical, and Plumbing Systems will also be included.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Asbestos Remediation.
Division 05 - Metals, Structural Steel Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Sheathing.
Division 07 - Thermal and Moisture Protection, Thermal Insulation, Elastomeric Membrane Roofing, Ethylene-Propylene-Diene-Monomer Roofing, Sheet Metal Flashing and Trim, Firestopping, Penetration Firestopping, Joint Sealants.
Division 08 - Openings, Glazing.
Division 09 - Finishes, Supports for Plaster and Gypsum Board, Non-Structural Metal Framing, Gypsum Board, Acoustical Ceilings, Acoustical Tile Ceilings, Resilient Flooring, Resilient Base and Accessories, High-Performance Coatings.
Division 22 - Plumbing, Plumbing Piping.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents