Similar Projects
(1.017-Mile) Smart Overlay and Drainage on US 20 (Grant Hwy) from McHenry County Line to I-90 (Jane Addams Memorial Tollway)
Infrastructure
Bidding
Hampshire, IL

Aintree Road Full Depth Reclamation
Infrastructure
Bidding
Saint Charles, IL

Laurel Street Culvert Replacement
Post-Bid
Elgin, IL 60120

Environmental Remediation Services (ERS)
Term Contract
Post-Bid
$47,000,000 est. value

Emerging Environmental Requirements Acquisition (EERA)
Results
Less than $49,000,000 est. value

Fox River Trail Culvert Repair and Improvements
Results
Elgin, IL 60120

Milton Township - Mulberry Culvert Lining
Infrastructure
Post-Bid
Algonquin, IL

7th Avenue Creek Construction Phase 1
Results
Saint Charles, IL

Environmental Remediation MAIDIQ (ERMA FY23)
Term Contract
Post-Bid

Ellithorpe Road Culvert Replacement
Results
Burlington, IL 60140

Island Park Drainage Improvements
Infrastructure
Post-Bid
Geneva, IL 60134

Improvement Consists of a Culvert Repair of the Structure (SN 045-0299)
Results
IL

Nelson Lake Marsh Revitalization
New Construction
Post-Bid
Batavia, IL

2021 HMS Culvert Replacement - Bid Release 4
Results
Hampshire, IL 60140

2022 MFT Asphalt Patching
Infrastructure
Post-Bid
Algonquin, IL

Last Updated 03/02/2022 04:07 AM
Project Title

Longmeadow Parkway Soil Remediation

Physical Address View project details and contacts
City, State (County) Carpentersville, IL 60110   (Kane County)
Category(s) Environmental, Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and disposal of unsuitable materials, removal and disposal of regulated substances (hazardous waste disposal and non-special waste disposal), installation of a soil retention system, erosion control as well as all incidental and collateral work necessary to complete the project.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Wetlands.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents