Similar Projects
North Broadway improvements- Gladstone to NE Barry Road - City of Kansas City
Infrastructure
Conception
$394,000 CJ est. value
Kansas City, MO 64155

North Broadway improvements- Gladstone to NE Barry Road - City of Kansas City
Infrastructure
Conception
$394,000 CJ est. value
Kansas City, MO 64155

MUNI - Subdivision - Cherry Hill Estates Fifth Plat - HKIT Architects
New Construction, Infrastructure
Design
Excelsior Springs, MO 64024

Synergy Services Inc Housing Units Redevelopment
New Construction, Infrastructure
Design
$8,300,000 CJ est. value
Kansas City, MO 64116

RFP Engineering - Linden Connector Trail Design
Infrastructure
Bidding
$750,000 CJ est. value
Gladstone, MO 64118

RFP Engineering - Linden Connector Trail Design
Infrastructure
Bidding
$750,000 CJ est. value
Gladstone, MO 64118

RFP D/B -Eye Center of Gladstone
New Construction, Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Gladstone, MO 64118

Engineering, Planning and Development
Post-Bid

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Bridge Washing on I-70 and Route
Infrastructure
Results
$250,000 to $500,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Liberty Self-Storage
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Liberty, MO 64068

Kinsley Forest Apartments - Phase 2
New Construction, Infrastructure
Pending Verification
$132,000,000 CJ est. value
Kansas City, MO 64118

SLBE - Sidewalks FY21-22 - CWA Missouri River South 2
Term Contract
Post-Bid
Kansas City, MO

Traffic Signal Modification at Gregory and Ward Parkway
Infrastructure
Results
$537,646 CJ est. value
Kansas City, MO 64113

Last Updated 08/11/2022 03:36 PM
Project Title

RFQ Engineering - Wayfinding and Signage Design Guideline

Physical Address View project details and contacts
City, State (County) Smithville, MO 64089   (Clay County)
Category(s) Heavy and Highway, Professional Services
Sub-Category(s) Architectural, Maintenance, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $15,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This request for qualifications is posted for the purpose of entering into a contract with an architectural firm to complete a wayfinding and signage design guideline. The City of Smithville and the Smithville Main Street District have partnered together for the primary purpose of obtaining a wayfinding and signage design guideline to promote a sense of place and celebrate what is unique about Smithville. The purpose of developing a guideline is to better promote the Smithville brand and to enhance the experience of residents and visitors alike. It is also meant to be used as a planning tool as funding becomes available for improvements to existing and future signage. The guide will raise the sense of arrival, increase aesthetics, and simplify vehicular and pedestrian movement throughout downtown and Smithville as a whole. The Smithville wayfinding and signage design guidelines will provide brand cohesiveness to citizens and visitors alike. We hope to incorporate vehicle wayfinding through highway and street signage and pedestrian wayfinding. This will allow the City of Smithville, and the Smithville Main Street District to showcase our parks, historic markers, and main street retail district. SCOPE OF PROJECT This RFQ is for a firm or team to design wayfinding signage as well as an implementation plan that designates sign locations. The firm is expected to be working with the City of Smithville, the Smithville Main Street, and the general public. The design and implementation plan should be adaptable and updatable to account for future development and assets and locations changing over time. Deliverables should include: 1. Template/prototype designs for wayfinding signage, identifying a standard aesthetic, materials selection and specific signage elements, including final concepts/schematics for, at minimum: a. Gateway signs b. Automobile navigation c. Destination signs, including public sites and municipal facilities d. Pedestrian and bicycle navigation e. Pathway signs 2. Establish style guidelines to inform future signage implementation 3. Develop statement of probable cost for fabrication and installation of wayfinding signage, i.e. bid ready documents. 4. A wayfinding implementation plan, including identification of signage locations and prioritized phases of installation Any questions regarding this RFQ should be directed to Anna Mitchell, Assistant City Administrator, 107 West Main Street, Smithville, Missouri 64089; (816) 532-3897. THE CITY OF SMITHVILLE RESERVES THE RIGHT TO REJECT ANY OR ALL PROPOSALS. The method of Contractor Selection has not been Determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents