Similar Projects
Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Historical and Museum Commission HVAC Services
Post-Bid
Harrisburg, PA

Chiller Overhaul
Results
PA

Second Floor Renovations, Contract No. 2018-02 (M) Hvac Renovations
Results
PA

Walk-in Coolers Plant Industry Labs
Post-Bid
Harrisburg, PA

Magisterial District Justice Office Smith - Contract No. 4 - Heating, Ventilating, and Air Conditioning Construction
Results
Harrisburg, PA

HVAC & Refrigeration Replacement / Maintenance
Term Contract
Post-Bid

Primary Center Gymnasium HVAC Upgrades
Results
Less than $124,800 est. value
Hershey, PA

Site Preparation Walk In Cooler
Post-Bid
Harrisburg, PA 17110

Granada Building Chiller Replacement
Results
Hershey, PA

New State Archives Construction - Phase 1 HVAC Construction
Post-Bid
$10,000,000 est. value
Harrisburg, PA 17120

Overhaul Trane Centravac Chiller CH2
Results
Middletown, PA

Outdoor Walk-In Refrigeration Unit
Post-Bid
Harrisburg, PA

HVAC System Improvements Project
Results
Less than $30,300 est. value
Highspire, PA 17034

Forum Building - Construction and Related Improvements - HVAC Construction
Post-Bid
Less than $10,000,000 est. value
Harrisburg, PA 17120

Last Updated 09/24/2019 08:23 AM
Project Title

Dauphin County Courthouse - Holding Area HVAC Renovations

Physical Address View project details and contacts
City, State (County) Harrisburg, PA   (Dauphin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Project entails the demolition and removal of an existing HVAC system and the installation of a new HVAC system to serve the Ground floor of the building, known as the Sheriffs Holding Cell. Work entails the installation of six horizontal mounted recessed ceiling cassette air handling units and three dual circuit outdoor mounted heat pump condensing units. Electrical wiring, duct systems, and piping is included in this work. This project will be constructed during off peak hours due to the daily uses of the building.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents