Similar Projects
Edgerton South Main Street Improvements
Infrastructure
Bidding
Edgerton, WI

Belleville Village Sidewalk 2021
Infrastructure
Bidding
Belleville, WI

Sewer Cleaning and Multi Sensor Inspection for the Pumping Station 16 Force Main
Post-Bid
Madison, WI

Stonefield Terrace Phase 2 Public Improvements
Post-Bid
$260,000 est. value
Madison, WI 53717

East Side Interceptor and MMSD PS 17 Force Main Relief Phase I
Results
Less than $8,800,000 est. value
Verona, WI

Boardwalk Replacement
Results
De Forest, WI 53532

State Street Sidewalk Repairs and North Park Street Sidewalk and Terrace Assessment District 2021
Infrastructure
Bidding
Less than $444,299 est. value
Madison, WI 53787

2021 Street Pulverization
Post-Bid
Stoughton, WI

Nine Springs Valley Interceptor Improvements - McKee Road to Dunn`s Marsh
Results
Fitchburg, Madison, WI 53719

Felland Road and Tranquility Trail Roundabout Assessment District - 2021
Infrastructure
Bidding
Madison, WI 53718

Sunfish Pond Parking Lot
Post-Bid
Deforest, WI

CIPP Rehab of Sanitary Sewers
Results
$1,141,590 est. value
Madison, WI 53703

Glacial Drumlin Trail
Post-Bid
Cottage Grove, WI

Sanitary Sewer Lining Replacement
Results
Less than $140,000 est. value
Madison, WI 53704

Sycamore Park Parking Lot Replacement
Post-Bid
Madison, WI 53704

Last Updated 05/21/2021 07:57 AM
Project Title

West Washington Avenue Assessment District

Physical Address View project details and contacts
City, State (County) Madison, WI 53787   (Dane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,490,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract shall include, but is not limited to, installation of water main and services, sanitary sewer main and laterals, storm sewer structures and pipes, curb and gutter, base preparation, asphalt pavement, concrete islands, street lighting, sidewalk, and driveway aprons. The project limits for the work are on W. Washington Ave. from Bedford St. thru Broom St., including a portion of S. Bassett St.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents