Similar Projects
Frankfort Parcels B and C Development
Demolition, New Construction, Infrastructure
Conception
$100,000,000 CJ est. value
Frankfort, KY 40601

Frankfort Parcels B and C Development
Demolition, New Construction, Infrastructure
Conception
$100,000,000 CJ est. value
Frankfort, KY 40601

Two Electrical Pedestals
Infrastructure
Design
$200,000 CJ est. value
Frankfort, KY 40601

Berry Hill Mansion Miscellaneous Repairs
Infrastructure
Bidding
$2,730,178 CJ est. value
Frankfort, KY 40601

Central Office Demolition & Bus Parking Lot Resurfacing
Demolition, Infrastructure
Bidding
$430,000 CJ est. value
Frankfort, KY 40601

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Peaks Mill Water District Sulphur Lick Road Booster Pump Station
New Construction, Infrastructure
Results
$250,000 CJ est. value
Frankfort, KY 40601

Asphalt Pavement and Roadway Rehabilitation
Infrastructure
Results
$400,000 est. value
Frankfort, KY

Long Rifle Road Extension Boone National Guard Center
Infrastructure
Construction
$236,000 CJ est. value
Frankfort, KY 40601

Long Rifle Road Extension Boone National Guard Center
Infrastructure
Construction
$236,000 CJ est. value
Frankfort, KY 40601

Wilkinson Boulevard Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Frankfort, KY 40601

Norton Immediate Care Center
New Construction, Infrastructure - 30,000 SF
Pending Verification
$10,000,000 CJ est. value
Frankfort, KY 40601

Pavement Markers and Reflectors
Infrastructure
Post-Bid
$600,000 CJ est. value
Richmond, KY 40475

Asphalt Resurfacing - Georgetown Road
Infrastructure
Results
$300,000 est. value
Frankfort, KY 40601

Last Updated 09/06/2023 11:07 AM
Project Title

Sam Wright Phase II AML Project

Physical Address View project details and contacts
City, State (County) Frankfort, KY 40601   (Franklin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Sam Wright Phase II AML Reclamation Project, with project limits boundaries enclosing approximately 1.0 acres, will create up to approximately 0.5 acre of disturbance. This project will address additional work needed after the completion of the first project. The waste area as designed has some movement. Abatement will be to construct a Class III Rock Toe Buttress to stabilize the old waste area. Also proposed is a concrete ditch that will carry surface water off the slide area and stabilize the hillside. Bituminous Pavement is proposed under this Phase II, as the first project no pavement was placed due to the anticipated Phase II project. This is a replace in kind due to the damage to the pavement under normal reclamation activities. Both Dense Grade Aggregate and Roadway Stone are included as needed for proper access. The Sam Wright AML Reclamation Project, with project limits boundaries enclosing approximately 1.0 acres, will create up to approximately 0.5 acre of disturbance. This project will address additional work needed after the completion of the first project. The waste area as designed has some movement. Abatement will be to construct a Class III Rock Toe Buttress to stabilize the old waste area. Also proposed is a concrete ditch that will carry surface water off of the slide area and stabilize the hillside. Bituminous Pavement is proposed under this Phase II, as the first project no pavement was placed due to the anticipated Phase II project. This is a replace in kind due to the damage to the pavement under normal reclamation activities. Both Dense Grade Aggregate and Roadway Stone are included as need for proper access. Lastly, a New off-site previously disturbed waste area is proposed. This waste area was recently used for the Joanna Napier Slide AMLRP, BIL funded project. We anticipate 0.5 Areas to be disturbed. The proposed reclamation action will not cause any disturbance to streams, forested areas, individual trees, caves or cave-like features (including underground mine openings and/or workings). The strict implementation and enforcement of Sediment and Erosion Control Best Management Practices will prevent any significant amount of sediments disturbed by project-related activities from entering area streams. For all other project information you must visit the State Plan Room. All documents related to this project shall be submitted, transmitted, transferred, reviewed, approved or rejected, and/or otherwise processed using the Owner's Document Collaboration System ( eCommunications) which is the Owner's web-based document collaboration system that shall be used by all project participants. No submission, transmittal, transfer, review, approval or processing shall be deemed Official without the use of this system. It is important that requesting firms identify the position of their firm as to the Prime Bidder, Misc. Subcontractor, Material Supplier or Other. All procurement questions shall be directed to buyer of record for this project. Important Please follow current state COVID guidelines for all Commonwealth of Kentucky construction projects. See Notice to Contractors/Advertisement for Bids for further COVID information. Instructions are included in the solicitation. Contractors must load their Bid Documents under the corresponding RFB in order for it to be received. If bid is not uploaded, the bid will be deemed non-responsive. Bidders are encouraged to take a screen shot verifying bid submittal. This is a secure website, no one can see these bids but the buyers All results will be posted electronically after the bid opening and review. If additional information is needed from the successful bidder the buyer will be in contact. Your bid must be uploaded prior to the bid closing date and time. The upload time may vary due to the size of your bid/proposal and/or internet speed. Bidder assumes full responsibility for timely delivery of the bid in compliance with the above described procedures and conditions.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents