Similar Projects
Pleasure Bay Crossing and Main Pump Station Replacement
Design
$20,000,000 est. value
Monmouth Beach, NJ 07750

Jersey Avenue Pump Station Replacement
Alteration
Bidding
$800,000 est. value
Metuchen, NJ 08840

Providing Preventative Maintenance and Repair Services for Lift Station Pumps at Various Cumberland County Locations
Term Contract
Bidding
NJ

Garden Street Pump Station Upgrade
Renovation
Post-Bid
$1,500,000 est. value
Mount Holly, NJ 08060

Furnishing, Maintenance, Service and Repair of Ocean City Sewer Lift Station and Storm Water Pump Stations
Post-Bid
Ocean City, NJ

Rehabilitation of Lower Preakness Pump Station
Results
Wayne, NJ 07470

Pump Station No. 12 Infrastructure Upgrade
Results
$800,000 est. value
Little Silver, NJ 07739

DDTH Pumping Station Project
Construction
Kearny, NJ 07032

WWTP Sludge Handling System and Emergency Pump Station Improvements
Renovation, Addition
Construction
Long Branch, NJ 07740

Wastewater Treatment Plant Effluent Pumping Station
New Construction
Bidding
$20,000,000 est. value
East Orange, NJ

Wallington Pumping Station Rehabilitation Project
Renovation
Post-Bid
Wallington, NJ

Allison Drive Pump Station Replacement
Results
Cherry Hill, NJ 08002

Harrison Avenue Pump Station Improvements
Renovation
Construction
Kearny, NJ 07099

Westfield Leas Pumping Station Upgrade
Renovation
Bidding
$650,000 est. value
Cinnaminson, NJ 08077

Purchase and Installation of one (1) In-Channel Grinder for the North Ridge Pump Station
Alteration
Post-Bid
Princeton, NJ

Reported 06/02/2022 12:00 AM
Project Title

Patcong Avenue Sewage Pump Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Linwood, NJ 08221   (Atlantic County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work for Contract No 32, Patcong Avenue Sewage Pump Station Rehabilitation includes the furnishing of all labor, materials, and equipment necessary to complete the work described in the Specifications and shown in the provided drawings. The work includes the replacement of the existing pumps, valve pit components and control panel. The wet well top slab will also be replaced in addition to miscellaneous storm water work and asphalt restoration. The work is located within City of Linwood.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents