Similar Projects
Park Ave and El Centro Highway Crossings Construction - WD25UT03 - City of Napa
Infrastructure
Conception
$1,000,000 est. value
Napa, CA

Salvador Avenue Complete Streets - City of Napa
Infrastructure, Alteration
Conception
$1,000,000 est. value
Napa, CA 94558

Hess Collection Expansion
New Construction, Infrastructure - 217,000 SF
Design
$22,000,000 CJ est. value
American Canyon, CA 94503

Repair Storm Damaged Slopes and Restore Ditches on SR 12
Alteration
Design
$1,245,000 est. value
Napa, CA 94558

2023 CIPP Lining Project (CIP 23702)
Infrastructure
Bidding
$550,000 CJ est. value
Napa, CA 94558

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

HMA, Roadway Excavation, Structural Conc and Modifying Lighting Systems
Infrastructure
Results
$42,000,000 est. value
CA

Napa Cove Affordable Apartments
New Construction, Infrastructure
Construction
$36,445,998 CJ est. value
American Canyon, CA 94503

Castlevale Winery
New Construction, Infrastructure - 21,795 SF
Pending Verification
$2,300,000 CJ est. value
Saint Helena, CA 94574

Element 7 / American Canyon
New Construction, Infrastructure - 7,000 SF
Pending Verification
$2,000,000 CJ est. value
American Canyon, CA 94503

Forrester Lane ADA Improvement - CP - 0027 - Town of Yountville
Infrastructure
Conception
$300,000 CJ est. value
Yountville, CA 94599

Costco Wholesale Warehouse / Napa
Demolition, New Construction, Infrastructure - 157,417 SF
Design
$14,000,000 CJ est. value
Napa, CA 94558

Drainage Improvements in Imperial County
Term Contract
Post-Bid
$300,000 est. value

Foxbow Mixed Use Development
Demolition, New Construction, Infrastructure - 145,886 SF
Pending Verification
$27,000,000 CJ est. value
Napa, CA 94559

Last Updated 10/07/2022 09:33 PM
Project Title

NBRID Wastewater Pond No. 2 Slope Stabilization Project

Physical Address View project details and contacts
City, State (County) Napa, CA 94558   (Napa County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $314,200 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located at 9625 Steele Canyon Road within the County of Napa. The primary objective of the project is to restore the earthen slope, liner and damaged evaporation system pipe and improve drainage at Wastewater Pond No. 2. HDPE liner will be cut and pulled back to expose the slide at pond bottom. Slumped material will be excavated and hauled to a staging sites across road at Steele Park Report. Approved filled to be placed and compacted in lifts rebuilding the side slop, reshape drainage collection ditches with pipe, reseam and weld HDPE liner then bench wrap along pond perimeter, hauling and disposal of spoils, site restoration and miscellaneous materials required for installation, and start-up and testing. The Contractor shall possess a Class "A" or "C-10 Electrical Contractor" license at the time of contract award. Proposals shall be submitted under sealed cover plainly marked as a proposal, and identifying the project to which the proposal relates and the date of the bid opening therefore. Proposals which are not properly marked will be rejected. Bid results of the three apparent low bidders with their subcontractor's list will be on the website the following day after the bids are publicly opened and read. The Plans and Specifications may be seen at the office of the Napa Berryessa Resort Improvement District, located within the Napa County Flood Control and Water Conservation District Office at 804 First Street, Napa California during regular business hours. In accordance with California Public Contract Code Section 3400, bidders may propose equals of products listed in the technical specifications or project plans by manufacturer name, brand or model number, unless the technical specifications or plans specify that the product is necessary to match others in use. Complete information for products proposed as equals must be submitted to the District for review at least 10 Days before the time specified for bid opening. This submission deadline shall control over the timeline set forth in Section 6-1.05 of the Standard Specifications. In accordance with Section 1771.1 of the Labor Code, a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirement of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public works, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. In accordance with the California Government Code Section 1773.2, copies of the applicable determinations of the Director are on file with at the Public Works Office and may be reviewed upon request. In accordance with the provisions of Section 1774 of the Labor Code, the prevailing wage rate for classifications of Labor to be employed in the work have been determined by the District's Governing Board and is included in the Special Provisions referred to above. No bid will be considered unless it is made on a blank form furnished by the District Engineer and is made in accordance with the provisions of the proposal requirements and conditions set forth under the Standard Specifications of the State California, Department of Transportation, except as modified in the above referred to Special Provisions. A bid guarantee in the amount of 10% of the total bid shall accompany the bid. The successful bidder shall be required to furnish a Performance Bond in an amount equal to 100% of the contract price and a Labor and Material Bond in an amount equal to 100% of the contract price with good and sufficient surety. Each bidder must be licensed as required by law. The Contractor shall possess a Class "A" or "C-10 Electrical Contractor" license at the time of contract award. The Contractor and Sub-Contractor shall be registered with the State of California Department of Industrial Relations (Public Works Contractor (PWC) Registration) at the time of bid opening. Contractors are required to sign-in to be eligible to bid; and eligible bidders are required to complete and submit the Site Visit Affidavit found in the Proposal Form pages with their bids. Written questions regarding this Notice must be delivered in person or by e-mail to Christopher Silke (christopher.silke@countyofnapa.org), Napa County Flood Control and Water Conservation District Office, 804 First Street, Napa, CA 94559 by Thursday, October 6, 2022 at 12 pm. No questions will be accepted after this deadline, and no questions will be answered by phone. The Board reserves the right to reject any or all bids.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents