Similar Projects
Construction of Barnegat Branch Trail Phase IX, Admiral Avenue to S. Main Street and Herflicker Boulevard
Results
Less than $1,000,000 est. value
South Toms River, NJ 08757

Replacement of Ridgeway Boulevard Bridge (Structure No. 1518-002)
Results
$1,000,000 to $5,000,000 est. value
Toms River, NJ 08754

Replacement of Main Street Bridge (Structure No. 1520-003), Main Street (C.R. 613) over Waretown Creek
Results
Less than $1,000,000 est. value
Waretown, NJ

Order for Professional Services No. P3692 Supervision of Construction Services for Contract No. P100.473, Bridge Repairs and Resurfacing, Milepost 0 to 126 (2020)
Results
$8,800,000 est. value
Woodbridge, NJ

Drawbridge Preventive Maintenance
Results
$20,000,001 to $50,000,000 est. value

Drawbridge Preventive Maintenance Contract
Results
$10,000,001 to $20,000,000 est. value

Drawbridge Preventive Maintenance Contract
Results
$10,000,001 to $20,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Maintenance Movable Bridge and Tunnel Repair Contract
Results
$10,000,001 to $20,000,000 est. value

Wright-Debow Road, Bridge Over Route 195
Results
Less than $5,000,000 est. value
Jackson, NJ 08527

Maintenance Orphan Bridge Repair Contract 2020-1, Various Locations, Statewide
Results
Less than $5,000,000 est. value

Maintenance Job Order Contracting (JOC) Bridge Repairs, South – 2019
Results
$5,000,001 to $10,000,000 est. value

Bridge Repairs and Resurfacing; Milepost 0 to 126 (2021)
Results

Signature Bridge Preventive Maintenance Contract 2019-1
Results
$20,000,001 to $50,000,000 est. value

Maintenance Movable Bridge and Tunnel Repair Contract, Statewide - 2021
Results
$10,000,001 to $20,000,000 est. value

Last Updated 11/19/2019 11:55 AM
Project Title

Replacement of Morris Boulevard Bridge

Physical Address View project details and contacts
City, State (County) Stafford, NJ 08050   (Ocean County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $6,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of Morris Boulevard Bridge (Structure No. 1530009), Morris Boulevard Over Fox Island Creek, Stafford Township. The work to be performed under this Contract consists of the complete replacement of the existing 46` long, 3-span concrete/steel and timber bridge with a 2-span, 51` long, precast concrete slab beam and concrete deck superstructure, supported on cast-in-place concrete pile caps and piles substructure. All work is to be done under a full roadway closure while maintaining marine navigation channel at all times

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents