Similar Projects
Police Shooting Range - Town of West Hartford
New Construction, Infrastructure
Conception
$750,000 CJ est. value
West Hartford, CT 06110

Mountain Road, Albany Avenue Intersection - City of West Hartford
Infrastructure
Conception
$1,600,000 CJ est. value
West Hartford, CT 06117

West Street Hotel
New Construction, Infrastructure - 22,620 SF
Design
$6,800,000 CJ est. value
Southington, CT 06479

Cheshire Community Ymca
Alteration
Design
Southington, CT 06489

RFQ Engineering - Drinking Water System Improvements
Infrastructure
Bidding
$300,000 CJ est. value
New Britain, CT 06051

Downtown Traffic Signal Improvements - Phase I
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Hartford, CT 06103

The Spark - 690 Cedar Street Apartments
New Construction, Infrastructure - 364,669 SF
Post-Bid
$55,000,000 CJ est. value
Newington, CT 06111

Renovations and Improvements at Casey Field and E.G. Stocks Playground
Infrastructure
Results
$516,500 CJ est. value
Bristol, CT 06010

Crack Sealing and Color Coating Hard Surface Courts
Infrastructure
Results
$178,500 CJ est. value
Manchester, CT 06040

O'Reilly Auto Parts (ENF) #6484 / Enfield
New Construction, Infrastructure - 7,250 SF
Construction
$1,900,000 CJ est. value
Enfield, CT 06082

The Byline Luxury Apartments
Term Contract, New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
West Hartford, CT 06107

Mastrianni Place Commercial Buildings
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Southington, CT 06489

Loukopoulos Building E
New Construction, Infrastructure - 12,600 SF
Pending Verification
$2,500,000 CJ est. value
Southington, CT 06489

Kennedy Park Improvements - Town of West Hartford
Infrastructure
Conception
$300,000 CJ est. value
West Hartford, CT 06119

2610 Main Street Multi Family Townhome Buildings / Glastonbury
New Construction, Infrastructure
Design
$3,500,000 CJ est. value
Glastonbury, CT 06033

Reported 07/12/2023 12:00 AM
Project Title

RFP D/B - Broad Street / Pequabuck River Retaining Wall

Physical Address View project details and contacts
City, State (County) Bristol, CT 06010   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

1.Obtaining all necessary local, state and federal permits include wetland permits and floodplain permits. i. Wetland delineation ii. Hydraulic Analysis (if necessary for environmental permitting or structural design) 2. Survey including required topographic and boundary survey. City scheduled to acquire parcel 40-3. 3. Design shall include a preliminary engineering study which shall include an evaluation of retaining wall alternatives, easements (if any), cost estimate and required permit. Construction time and cost is a factor in the type of retaining wall, the use of modular wall may be acceptable provided it has a service life of 50 years and can be used along Pequabuck River. 4. Retaining wall design shall include reconstruction of Broad Street disturbed as part of construction, including roadside barrier, curbing and drainage. 5. Construction phasing and traffic control plan. City anticipates closure of the west bound traffic while maintaining east bound traffic. City anticipates a bid alternate deduct to close road (open to local traffic only) from Todd St to Central Street. 6. Utility Relocation and Coordination The City also reserves the right to negotiate further with one or more of the firms as to any features of their submissions and to accept modifications of the work and price when such action will be in the best interests of the City In addition to the above, the awarded contractor shall provide a certificate of insurance in the minimum amounts as specified herein. Said insurance shall be provided at the sole expense of the Contractor with an insurance company which is licensed to do business in the State of Connecticut. Questions regarding this document should be referred to Roger D. Rousseau at (860) 584-6195 or at rogerrousseau@bristolct.gov .

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents