Similar Projects
The Settlement
New Construction
Conception
Simpsonville, SC

Southern Commons - Master Plan
New Construction
Conception
Cayce, SC 29172

Long Savannah - Master Plan
New Construction
Design
Charleston, SC

The Exchange at Old Town Depot
New Construction - 45,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Rock Hill, SC

Old Towne Creek County Park Phase 1 Development
Renovation
Bidding
Charleston, SC 29407

Tyger River Park Dog Park
Infrastructure
Bidding
Duncan, SC 29334

The Shores of Asbury Campground
New Construction
Sub-Bidding
Less than $500,000 est. value
Anderson, SC 29625

Tennis Court Rehabilitating Foster Park
Post-Bid
Union, SC 29379

Playground Inspections
Post-Bid
SC

Davis-Bailey Park Construction
Results
Less than $4,180,219 est. value
Saint George, SC

Bea Thompson Park Improvements
Results
$486,085 est. value
Anderson, SC 29621

St. Andrew By-The-Sea United Methodist Church Campus
New Construction
Construction
$755,000 est. value
Bluffton, SC 29910

Woods Crossing
New Construction - 8,400 SF
Construction
$8,000,000 est. value
Greenville, SC

Cornerstone
New Construction
Conception
Anderson, SC 29625

Ridge on Rolling Hills Apartments
New Construction - 329,977 SF
Design
$25,000,000 est. value
Easley, SC

Last Updated 09/27/2021 09:47 AM
Project Title

Clemson Park Pump Track

Physical Address View project details and contacts
City, State (County) Clemson, SC   (Oconee County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design layout for the asphalt pump track within the specified area of Clemson Park along with a “flow line” lead-in connecting to the existing concrete trail. The pump track must: 1. Have a smooth 4” asphalt (HMA), with a compacted stone base, riding surface of at least 6’ wide; 2. Fit within the perimeter specified in Exhibit #1; 3. Include features to help riders gain confidence and control while riding; 4. Be suitable for as broad range of ages and abilities as reasonably feasible; and, 5. The layout should work with existing contours. 2. Design a drainage plan that will tie into the existing catch basin shown in Exhibit #1; 1. After any rain event the pump track should not have standing water within the boundary of the track; 2. The drainage should help transfer as much water towards the level spreader as possible; and, 3. The Pump track team will work with the City Engineer for area drain and pipe sizing. 3. Construction of the approved layout out of materials, the cost should include, but are not limited too: 1. Permitting cost; 2. Man hours for pump track and drainage installation, to include 16 ft drainage swell within existing concrete path specified in Exhibit #1; 3. Man and Machine hours; 4. Overhead & Profit; 5. Materials (dirt, fill, gravel, asphalt, Seed & Straw etc); 6. Erosion control; 7. Final Grading and stabilization to Parkland City Spec, Exhibit #2; 8. Installation of 10 trees provided by City Horticulturist and to their specifications; 9. 30” wood post and wire perimeter fencing specified as detail in Exhibit #1; 10. Stabilization to include 4’ of sod perimeter around pump track and inside the “fast track”; and, 11. Construction Safety. 4. Options for stabilization of the side of the pump track slopes, these options should account for: 1. Maintenance considerations; 2. Cost; and, 3. Material availability.

Details

Park/Playground, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents