Similar Projects
Last Updated | 09/27/2021 09:47 AM |
Project Title | Clemson Park Pump Track |
Physical Address | View project details and contacts |
City, State (County) | Clemson, SC (Oconee County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Design layout for the asphalt pump track within the specified area of Clemson Park along with a “flow line” lead-in connecting to the existing concrete trail. The pump track must: 1. Have a smooth 4” asphalt (HMA), with a compacted stone base, riding surface of at least 6’ wide; 2. Fit within the perimeter specified in Exhibit #1; 3. Include features to help riders gain confidence and control while riding; 4. Be suitable for as broad range of ages and abilities as reasonably feasible; and, 5. The layout should work with existing contours. 2. Design a drainage plan that will tie into the existing catch basin shown in Exhibit #1; 1. After any rain event the pump track should not have standing water within the boundary of the track; 2. The drainage should help transfer as much water towards the level spreader as possible; and, 3. The Pump track team will work with the City Engineer for area drain and pipe sizing. 3. Construction of the approved layout out of materials, the cost should include, but are not limited too: 1. Permitting cost; 2. Man hours for pump track and drainage installation, to include 16 ft drainage swell within existing concrete path specified in Exhibit #1; 3. Man and Machine hours; 4. Overhead & Profit; 5. Materials (dirt, fill, gravel, asphalt, Seed & Straw etc); 6. Erosion control; 7. Final Grading and stabilization to Parkland City Spec, Exhibit #2; 8. Installation of 10 trees provided by City Horticulturist and to their specifications; 9. 30” wood post and wire perimeter fencing specified as detail in Exhibit #1; 10. Stabilization to include 4’ of sod perimeter around pump track and inside the “fast track”; and, 11. Construction Safety. 4. Options for stabilization of the side of the pump track slopes, these options should account for: 1. Maintenance considerations; 2. Cost; and, 3. Material availability. |
||||||||||
Details | Park/Playground, Renovation.
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |