Similar Projects
Phase 5 School Bond Renovation
Renovation, Addition
Conception
Arlington, TX

New Elementary School Bastrop
New Construction
Conception
Bastrop, TX 78602

Wisdom Academy Phase I
New Construction - 12,600 SF
Design
$1,000,000 est. value
Carrollton, TX 75006

Maintenance Facility Project
New Construction
Design
$10,610,000 est. value
El Paso, TX

2021 Ault and Willbern Elementary School Renovations
Renovation
Bidding
Cypress, Houston, TX 77433

2022 Kitchen Renovations
Renovation
Bidding
Klein, Spring, TX 77389

Northampton Elementary School Renovations
Renovation - 20,000 SF
Post-Bid
$1,411,884 est. value
Spring, TX 77389

Sabine Pass Independent School Kitchen Renovation
Renovation - 8,300 SF
Post-Bid
Sabine Pass, TX 77655

2019 Millsap and Wilson Elementary School Renovations
Renovation
Results
Less than $26,000,000 est. value
Houston, TX 77084

Construction Manager-at-Risk (CMAR) Services for Bond 2016 Barnes Elementary School Classroom Addition
Addition - 13,125 SF
Results
Less than $4,000,000 est. value
Corpus Christi, TX 78414

New Elementary School in the Caney Creek Feeder Zone - Flex School #20
New Construction
Construction
Less than $28,075,000 est. value
Conroe, TX

Construction Manager at Risk New Elementary in the Conroe High Feeder Zone Flex #21
New Construction
Construction
$29,758,680 est. value
Conroe, TX 77304

Freeman Elementary School Renovation
Renovation
Pending Verification
Irving, TX 75063

Good Elementary School Improvements
Renovation
Pending Verification
Carrollton, TX 75006

New Elementary School Cedar Creek
New Construction
Conception
Cedar Creek, TX

Last Updated 04/14/2022 08:38 AM
Project Title

NISD Building Replacement at Colby Glass Elementary School

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78228   (Bexar County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work of the project includes the construction of a new cafeteria/gymnasium building at Glass Elementary School for the Northside Independent School District. The construction of the new building shall include Structural, MEP systems and Technology/Security systems. The site scope of work will consist of grading, site improvements and landscaping.

Details

Elementary School, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents