Similar Projects
Milwaukee - Fond Du Lac Const / Bridge Rehab
Infrastructure
Conception
$14,000,000 CJ est. value
Hartford, WI 53027

S Main Watermain Replacement - 350-15-300 - City of Hartford
Infrastructure
Conception
$374,000 CJ est. value
Hartford, WI 53027

Capstone 41 Business Park Phase II and Phase III
New Construction, Infrastructure - 294,600 SF
Design
$316,400,400 CJ est. value
Germantown, WI 53022

N'Dulge Salon
New Construction, Infrastructure - 1,600 SF
Design
$350,000 CJ est. value
West Bend, WI 53095

Fond Du Lac Avenue
Infrastructure
Bidding
$6,000,000 CJ est. value
West Bend, WI 53095

Fond Du Lac Avenue
Infrastructure
Bidding
$6,000,000 CJ est. value
West Bend, WI 53095

2022 Road Program - Town of Erin
Infrastructure
Post-Bid
$450,000 CJ est. value
Erin, WI 53027

RFQ Engineering - Perpetuation - Resurface
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Kewaskum, WI 53040

2021 Road Program
Infrastructure
Results
$230,545 CJ est. value
Erin, WI 53027

Country Aire Drive Water and Sewer Extension
Infrastructure
Results
$500,000 est. value
Germantown, WI 53022

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Golden Pet Manufacturing Addition
Addition, Infrastructure - 129,147 SF
Pending Verification
$10,000,000 CJ est. value
Germantown, WI 53022

Chipotle / West Bend
Demolition, New Construction, Infrastructure - 2,361 SF
Pending Verification
$1,900,000 CJ est. value
West Bend, WI 53095

W Rossman Street Reconstruction - 301-08-380 - City of Hartford
Infrastructure
Conception
$839,800 CJ est. value
Hartford, WI 53027

Last Updated 10/18/2023 05:36 AM
Project Title

Slinger Speedway Drainage Improvements

Physical Address View project details and contacts
City, State (County) Slinger, WI 53086   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project involves the installation of storm water improvements at the Slinger Speedway site, including excavation and grading for an infiltration basin, 1,090 LF of ditching, 385 LF of storm sewer installation, manholes and end sections, 1,890 LF of underdrain pipe installation and cleanouts, 112 LF of culvert installation and end sections, clearing and grubbing, erosion control, and restoration. The Project Manager for this Project is Greg R. Calhoun, P.E., who may be contacted at Ruekert & Mielke, Inc., W233 N2080 Ridgeview Parkway, Waukesha, WI 53188- 1020, (262) 542-5733, regarding the Project. Partial sets of Bidding Documents are not available. Neither Owner, Engineer nor Issuing Office is responsible for full or partial sets of Bidding Documents, including any Addenda, obtained from other sources. The cost of Bidding Documents is non-refundable. Each entity obtaining Bidding Documents from the Issuing Office will be designated as a Plan Holder of Record. Bids received from entities who are not Plan Holders of Record may be returned as being nonresponsive. A Bidder's qualification statement must be delivered to Village of Slinger at least 5 days before the Bid opening date. Bids shall be accompanied by a Bond or Certified Check payable to Village of Slinger equal to 5 percent of the Bid. If the successful Bidder fails to execute the Contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited to Village of Slinger as liquidated damages. Construction time is of the essence. Completion delays are subject to liquidated damages. The Village of Slinger re- serves the right to accept the most advantageous Bid, or to reject any & all Bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes. Village of Slinger Margaret Wilber Administrator RUEKERT & MIELKE, INC. W233 N2080 Ridgeview Pkwy Waukesha, WI 53188-1020 Phone: (262) 542-5733 Fax: (262) 542-5631. The Project for which the Work under the Contract Documents is a part is generally described as follows: Slinger Speedway Drainage Improvements Contractor shall complete all Work as specified or indicated in the Contract Documents. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all Plan Holder's of Record. Questions received from Bidders that do not, in Engineer's opinion, allow sufficient time to respond prior to the date for opening of Bids will not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents