Similar Projects
Massey Chapel Road Townhomes
New Construction, Infrastructure
Conception
$9,000,000 CJ est. value
Durham, NC 27713

Mockingbird Lane and Sherron Road Townhomes
New Construction, Infrastructure
Conception
$47,000,000 CJ est. value
Durham, NC 27701

KLG Warehouse
New Construction, Infrastructure - 24,000 SF
Design
$3,000,000 CJ est. value
Durham, NC 27705

Core Durham
New Construction, Infrastructure - 120,000 SF
Design
$23,000,000 CJ est. value
Durham, NC 27701

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Tru by Hilton Hotel / Durham
New Construction, Infrastructure - 43,569 SF
Bidding
$10,000,000 CJ est. value
Durham, NC 27703

Duke School - Innovation Center & Library Renovation
New Construction, Renovation, Infrastructure - 13,799 SF
Sub-Bidding
$10,000,000 CJ est. value
Durham, NC 27705

North Carolina Central University Collaborative Learning and Research Center
New Construction, Infrastructure - 4,900 SF
Post-Bid
$3,000,000 CJ est. value
Durham, NC 27707

Water Flow Metering and Telemetry System
Infrastructure
Post-Bid
Raleigh, NC

Quail Hollow and Brentwood Water Replacement (Formal)
Infrastructure
Results
Raleigh, NC

Davie Street Water and Sewer Improvements
Infrastructure
Results
$3,000,000 to $4,500,000 est. value
Raleigh, NC

4800 Duraleigh Road Apartments
New Construction, Infrastructure
Construction
$90,000,000 CJ est. value
Raleigh, NC 27612

HUB RTP Horseshoe Commons Building
New Construction, Infrastructure - 125,000 SF
Construction
$26,000,000 CJ est. value
Durham, NC 27703

AAA Self-Storage Expansion
Addition, Infrastructure
Pending Verification
$700,000 CJ est. value
Durham, NC 27701

New Elementary School F Project
New Construction, Infrastructure - 108,000 SF
Pending Verification
$49,326,165 CJ est. value
Durham, NC 27713

Last Updated 02/13/2023 11:04 AM
Project Title

Martin Pond Road Water Main Extension

Physical Address View project details and contacts
City, State (County) Wendell, NC 27591   (Wake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $3,571,596 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 13, 2022, construction is underway and expected to be completed by the end of March, 2023. No further inquiries to be accepted. After Bids are opened, the Owner shall evaluate them in accordance with the methods and criteria set forth in the Instructions to Bidders. The Owner/City Council reserves the right to waive any informality or to reject any or all Bids. Unless all Bids are rejected, Award will be made to the lowest responsible and responsive Bidder, taking into consideration quality, performance and the time specified in the Bid Form for the performance of the Contract. Requirements for pre-bid submittals of an "or-equal" are required within 10 days of the issuance of the Advertisement for Bids and in accordance with Section 00200, Instructions to Bidders. The Project consists generally of the following major items: The project includes construction of approximately 8,810 LF of 24-inch ductile iron water main along Martin Pond Road via open cut to provide a connection from the intersection of Wendell Falls Road to Eagle Rock Road in the Town of Wendell. The water main will cross two (2) streams via open cut. Construction will include two (2) segments of dry bore and jack for a total of 115 LF beneath NCDOT road segments with 36-inch steel casing. Bidding Documents may be examined at Engineer's office. With each request for Bidding Documents supply the following information: Company name, contact person, street address, phone number, and email address for Bidding point of contact; N. C. contractor's license with limitation and classification; indicate if the firm will be a Prime bidder, Supplier or Sub-Contractor. Bidders will be required to show evidence that they are licensed to perform the work in the Bidding Documents as required by North Carolina General Statute, Chapter 87 and the Instruction to Bidders. Pursuant to General Statutes of North Carolina Sections 143-128.2 and 143-131, and in accordance with City policy, the City of Raleigh encourages and provides equal opportunity for certified Minority and Woman-Owned Business Enterprise (MWBE) businesses to participate in all aspects of the City's contracting and procurement programs to include Professional Services; Goods and Other Services; and Construction. The prime contractor will be required to identify participation of MWBE businesses in their Bid, and how that participation will be achieved. Furthermore, the City's goal is to contract or sub-contract fifteen percent (15%) of the contract amount to certified MWBEs on construction projects over $300,000, or with contracts that include $100,000 or more in state funding. *This project has been awarded and all trades have been let.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents