Similar Projects
Wiley Creek Assisted Living Facility
Addition, Demolition, New Construction, Infrastructure - 25,650 SF
Design
$7,000,000 CJ est. value
Sweet Home, OR 97386

BLM Northwest Oregon District Quartzville Access Road Culvert Replacement and Road Repair
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Foster, OR 97345

Albany Train Station Restroom
New Construction, Infrastructure - 276 SF
Bidding
$300,000 CJ est. value
Albany, OR 97321

2022 Beachie Creek Resurfacing of North Fork Road Southeast Asphalt Concrete Paving
Infrastructure
Bidding
$3,000,000 CJ est. value
Lyons, OR 97358

Westside Sewer Interceptor Project
Infrastructure
Post-Bid
Lebanon, OR 97355

Monroe Street Rehabilitation
Infrastructure
Post-Bid
$355,000 to $375,000 est. value
Harrisburg, OR 97446

Albany and Corvallis Signal Improvements - Benton and Linn Counties
Alteration
Results
$1,000,000 to $2,000,000 est. value

Albany and Corvallis Signal Improvements - Benton and Linn Counties
Alteration
Results
$1,000,000 to $2,000,000 est. value

Calapooia Commons
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Albany, OR 97321

Albany Helping Hands
Addition, Demolition, Build-out, Infrastructure - 1,716 SF
Design
$400,000 CJ est. value
Albany, OR 97322

Wilbur Ellis
New Construction, Infrastructure - 85,250 SF
Bidding
$20,000,000 CJ est. value
Millersburg, OR 97321

North Albany Elementary School (NAES) and Waverly Elementary School (WES)
New Construction, Infrastructure
Post-Bid
$300,000 est. value
Albany, OR 97321

US20: 53Road Avenue - East of 60th Avenue (Sweet Home) Section of the Santiam Highway
Infrastructure
Results
$1,000,000 to $2,000,000 est. value
OR

OR99E - American Drive to South City Limit (Halsey) Phase 1
Infrastructure
Results
$5,000,000 to $10,000,000 est. value
Halsey, OR

Jefferson Street and First Avenue Water Line
Infrastructure
Results
$900,000 est. value
Albany, OR

Last Updated 10/03/2022 11:31 AM
Project Title

Strawberry Lane Sanitary Sewer Extension

Physical Address View project details and contacts
City, State (County) Lebanon, OR 97355   (Linn County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The outside of the envelopes shall plainly identify the following: Project Name and Number Bid Opening Time and Date Bidders Company Name Bidders CCB License Number Proposals submitted after the above-specified time or with incomplete or incorrect information will be considered non-responsive. If you have any questions concerning the project, please contact Kolson Shanks, Engineering Associate, at 541-258-4267. The major work to be done includes the following approximate quantities: 320 lineal feet of 8-Inch P.V.C. Sanitary Sewer Pipe, 250 lineal feet of 4-Inch Deep Connection Sanitary Sewer Service Pipe, 7 Sanitary Sewer Service Clean-outs, one 48-Inch Live Cast-in-Place Sanitary Sewer Manhole, one 48-Inch Concrete Sanitary Sewer Manhole, 45 square yards of HMAC Trench Resurfacing, the Removal and Disposal of 6 trees, Clearing and Grubbing, and the performance of additional and incidental work as called for in the plans and specifications. The Engineers Estimate is between $150,000.00 and $250,000.00. The general specifications applicable to this job are the 2021 Oregon Standard Specifications for Construction, published jointly by the American Public Works Association (Oregon Chapter) and the Oregon Department of Transportation. These specifications are supplemented by City Supplemental Standard Specifications and project Special Provisions. No proposal will be considered unless it contains a statement that the Bidder will comply with the provisions required by ORS 279C.840, that workers of public works be paid not less than prevailing rate of wage on contracts of $50,000.00 or more. Each bid shall contain a statement verifying that the Bidder is a resident bidder as defined in ORS 279A.120. The Contractor or subcontractor must be registered with the Construction Contractors Board as required by ORS Chapter 701. Bidders shall comply with all requirements set forth in Chapter 279A, B, C and other applicable sections of the Oregon Revised Statutes. Bidders are required to disclose proposed first-tier subcontractors. The City of Lebanon encourages the subcontractor disclosure form be submitted with the bid documents but will accept this list no later than 11:00 a.m., October 4, 2022 (two hours after bid opening). All proposals shall be submitted on the prescribed form and in the manner as indicated in the specifications and shall be accompanied by a certified or cashier's check or bid bond in the amount of ten (10) percent of the total amount of the proposal. The bid bond shall be issued by a surety authorized and licensed to issue such bonds in the State of Oregon, conditioned that the successful Bidder will pay the City of Lebanon, as liquidated damages, the amount specified in the bond, unless the Bidder enters into a contract with the Bidder's proposal and furnishes an insurance certificate and a performance bond with surety satisfactory to the City of Lebanon in an amount equal to 100 percent of the contract price within ten days of the date of notification to successful Bidder. If the Bidder fails to enter into the contract and furnish the performance bond within the above-specified time, the check (or bid bond) and the amount thereof shall be forfeited to the City of Lebanon. The City of Lebanon reserves the right to award the contract to the firm submitting the most qualified proposal, to postpone the acceptance of the proposal and the award of contract for a period not to exceed 30 days, or to reject any and all proposals received. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents