Similar Projects
2021 Road Improvements
Post-Bid
Indian Point, MO

Roadwork
Post-Bid
Kirksville, MO

Intersection Improvements
Results
Gladstone, MO 64119

Sunridge Park Asphalt and Sealing Project 2021
Results
Hillsboro, MO 63050

Improving Mueller Road
Infrastructure
Post-Bid
Green Park, MO 63123

Highway 210 and Walker Road Intersection Improvements
Results
North Kansas City, MO

Sidewalk Removal and Replacement
Alteration
Post-Bid
Potosi, MO 63664

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

Transportation Shop Concrete Project
Infrastructure
Post-Bid
Potosi, MO

2021 Mill and Overlay Program
Results
Gladstone, MO

Asphalt Overlay Portions of Perry County Roads
Alteration
Post-Bid
MO

2021 Intermediate Maintenance Program
Results
Gladstone, MO

2021 Asphalt Pavement Improvement
Infrastructure
Post-Bid
Jackson, MO

2021 Mill, Mat and Asphalt Overlay Program
Results
Festus, MO

Asphalt Repair and Sealing
Infrastructure
Post-Bid
MO

Reported 05/03/2022 12:00 AM
Project Title

Asphalt Overlay of the Walking Trail, the Parking Lot, the Roadway, and Parking Lot Striping at Avery Park

Physical Address View project details and contacts
City, State (County) Troy, MO 63379   (Lincoln County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Troy, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot. The City of Troy is requesting sealed bids for the asphalt overlay of the walking trail, the parking lot, the roadway, and parking lot striping at Avery Park. Bid recommendations will be awarded at the regular meeting of the Board of Alderman on May 23rd, 2022. For questions contact Ryan Howell at 636-462-7605.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents