Similar Projects
Goldsborough Neck Road Improvements
Results
Easton, MD 21601

Mistletoe Hall Farm Subdivision and Infrastructure Project
Post-Bid
$2,500,000 to $5,000,000 est. value
Easton, MD 21601

Microsurfacing and Fog Sealing at Various Locations
Results
$1,000,001 to $2,500,000 est. value

Miscellaneous Roadway Structure Repairs at Various Locations
Results
$1,000,000 to $2,500,000 est. value

CRS-2L Emulsified Asphalt with Polymer and/or CRS-2 Emulsified Asphalt
Term Contract
Post-Bid
Easton, MD 21601

Crack Sealing at Various Locations
Results
$500,001 to $1,000,000 est. value

Permanent Patching of Asphalt Superpave at Various Locations
Results
$500,001 to $1,000,000 est. value

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Cabin 11 - Foundation Waterproofing, New Germany State Park, Garrett County
Results
Less than $50,000 est. value
Grantsville, MD 21536

Mill and Resurface
Results
$2,500,001 to $5,000,000 est. value
MD

Chip Seal at Various Locations
Results
$1,000,001 to $2,500,000 est. value

Interstate 295 Miscellaneous Roadway Improvements
Post-Bid
$3,900,000 est. value
Wilmington, DE 19801

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Ultra-Thin Bonded Wearing Course at Various Locations
Results
$2,500,001 to $5,000,000 est. value

Mill and Pave
Results
Saint Michaels, MD 21663

Last Updated 06/17/2020 01:45 PM
Project Title

Annual Street Resurfacing 2020

Physical Address View project details and contacts
City, State (County) Easton, MD 21601   (Talbot County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done under this contract consists of the furnishing of all labor, equipment and material to complete approximately 22,829 s.y. of two inches (2) Cold Milling & Surface Removal, and approximately 22,829 s.y. of two (2) inches (Superpave 9.5mm) Hot Mix Resurfacing in the Town of Easton. The locations of the work performed under this contract are as follows: 2” COLD MILLING & SURFACE REMOVAL STREET LOCATION Wrightson Avenue Washington Street - Arbor Place 3,683 SY Dover Road Rails To Trails - Tred Avon Avenue 3,544 SY Park Street South Street - Smiths Alley 1,641 SY Brookletts Avenue Aurora Street - Higgins Street 2,456 SY Port Street Washington Street - Near Clay Street 1,798 SY Holly Road US-50 - Pin Oak Way 2,479 SY Brett Road Corbin Parkway - Cul-De-Sac 4,323 SY Kathy Street Will Street - Cul-De-Sac 2,905 SY TOTAL 22,829 S Y

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents