Similar Projects
Factory Mattress Distribution Facility
New Construction
Conception
Kyle, TX

Highway 80/Davis Lane 18" Wastewater Rehabilitation - 669 - City of San Marcos
Renovation
Conception
$3,550,000 est. value
San Marcos, TX 78666

Ascension Seton Hays OR Storage Expansion
Addition, Demolition - 1,263 SF
Design
$518,819 est. value
Kyle, TX 78640

Stream Buda / Building 4
New Construction - 227,129 SF
Design
$13,627,740 est. value
Buda, TX 78610

Widen Road - Add Lanes and Shoulders - FM 621
Infrastructure
Bidding
$2,765,187 CJ est. value
San Marcos, TX 78666

RM 12 - Widen Road - Add Lanes
Infrastructure
Bidding
$4,135,673 CJ est. value
San Marcos, TX 78666

FM 2001 - Crack Seal
Infrastructure
Sub-Bidding
$288,528 CJ est. value
Buda, TX 78610

Sunfield Wastewater Treatment Plant (WWTP) Expansion to 0.99 MGD AW and GBRA - Package 8
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Buda, TX 78610

Security Equipment
Alteration
Post-Bid
Wimberley, TX 78676

Amplifier, 7Fa Gas Turbine Flame Scanner
Alteration
Post-Bid
Austin, TX 78767

High Density Shelving Material Supply Inventory Replenish System
Results
San Antonio, TX 78236

Anthropology Lab Office Building
Results
Less than $1,497,000 est. value
San Marcos, TX

Kyle Business Park
New Construction - 10,500 SF
Construction
$890,000 est. value
Kyle, TX 78640

Barnes 35
New Construction - 270,000 SF
Pending Verification
$11,000,000 est. value
San Marcos, TX

Wimberley Square
New Construction, Infrastructure - 3,223 SF
Pending Verification
$850,000 CJ est. value
Wimberley, TX 78676

Last Updated 07/22/2022 07:01 AM
Project Title

Sunfield WWTP Expansion to 0.99 MGD - Package 3B - Treatment Plant Construction and Start-up

Physical Address View project details and contacts
City, State (County) Buda, TX 78610   (Hays County)
Category(s) Commercial, Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Equipment, Sewage Treatment Plant, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The general scope of the project is below. This package is for the actual construction of the Treatment Plant Expansion, Installation and Start-up of equipment, as well as all Inclusions within the Proposal Package. The Project will expand the capacity of the Sunfield WWTP to 0.99 million gallons per day (MGD). The target start-up schedule for the plant is on or before August 1, 2023. The current design includes the following components Influent Lift Station modifications Preliminary Treatment Unit sized for up to 2 MGD average daily flow (ADF) capacity and expandable to 4 MGD ADF A 1 MGD ADF Aeration Basin Blowers and associated air header Electrical Distribution System A 1 MGD ADF concrete clarifier basin Alum feed system RAS/WAS pump station sized for the new plant capacity A 1 MGD ADF concrete chlorine contact basin Plant non-potable water system Sludge Dewatering Equipment Yard Piping Generator Electrical and Instrumentation and Controls 0663-009-10

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents