Similar Projects
Last Updated | 10/15/2022 06:31 PM |
Project Title | RFQ Construction Manager at Risk- University of Nebraska Medical Center (UNMC) Student Health Clinic Project |
Physical Address | View project details and contacts |
City, State (County) | Omaha, NE 68198 (Douglas County) |
Category(s) | Education, Heavy and Highway, Medical |
Sub-Category(s) | College/University, Medical Office/Outpatient, Site Development |
Contracting Method | Construction Management - CM at Risk, Competitive Bids |
Project Status | Request for Qualifications, Construction start expected November 2022 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The University of Nebraska Medical Center (UNMC or University or University of Nebraska) intends to procure a qualified contractor to provide pre-construction services and construction services as the Construction Manager at Risk (CMR) for the Student Health Clinic project. The estimated construction cost for the CMR Guaranteed Maximum Price (GMP) is $1,000,000. The scope of work includes approximately 2,775 square feet of existing second floor space of the Student Life Center to be renovated for relocation of a Student Health Clinic. The proposed design consists of four new (4) Exam Rooms and one (1) future Exam Room (to be rough in plumbed under this project), one (1) Office, and support spaces. An existing Electrical Room will remain. Contractors will have access to the existing first floor space below as well as access to the existing third floor space above the project area of construction. The campus bookstore is adjacent and north of the project area of second floor. The construction staging area has not been determined at this time. The existing floor slab is a concrete ribbed slab. All penetrations must be coordinated with existing beams. No exterior work is anticipated or part of the scope of this project. Existing construction type is II-B, B Occupancy, sprinklered. Questions/Clarifications Due 7/8/2022 3:00:00 PM (CT) All questions/clarifications regarding this RFP must be submitted in this eBid system by the date and time indicated. Questions must be submitted to ebid@nebraska.edu. Response to Questions/Final Addendum 7/12/2022 3:00:00 PM (CT) The University of Nebraska will respond to any questions or clarifications submitted via email through this eBid system by the deadline date. Those responses will be posted on this bid via an addendum. |
||||||||||||||||||||||||||||||||||||||||||
Details | 2 Stories Above Grade, 2,775 SF.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |